My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04684
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04684
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:08 PM
Creation date
10/12/2006 12:31:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.500
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1975
Title
Appendix C - Water Quality Management Plan - Colorado River Basin - Water Quality Standards for Salinity Including Numeric Criteria and Plan of Implementation for Salinity Control
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ 1. Prompt eonstruction and operation of the initial four <br />00 <br />~ salinity control units authorized by Title II of PL 93-320, <br />~ <br /> <br />the Colorado River Basin Salinity Control Act. <br />2. Construction of the 12 other units listed in Title II <br />of PL 93-320 or their equivalent after receipt of favorable <br />planning reports. <br />3. The placing of effluent limitations, principally <br />under the NPDES permit program provided for in Section 402 <br />of PL 92-500 on industrial discharges. <br />4. The reformulation of previously authorized, but <br />unconstructed, federal water projects to reduce the salt <br />loading effect. <br />5. Use of saline water for industrial purposes whenever <br />practical, programs by water users to cope with the river's <br />high salinity, studies of means to minimize salinity in <br />municipal discharges, and studies of future possible salinity <br />control programs. <br />The report recognizes that many natural and man-made factors <br />affect the river's salinity. Consequently, the actual salinity will <br />vary above and below the recommended numeric criteria. However, <br />under the assumptions of streamflow equivalent to the long-term <br />average, a "moderate" rate of increase in water depletions and <br />full implementation of needed salinity control measures, the average <br />salinity can be maintained at or below 1972 levels during the study <br />period of the next 15 years. <br /> <br />, <br />The federal regulations provide for temporary increases above <br /> <br /> <br />the 1972 levels if eontrol measures are included in the plan, Should <br /> <br />-ii- <br /> <br />. <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.