My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04675
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:06 PM
Creation date
10/12/2006 12:31:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543
Description
Closed Basin Division
State
CO
Basin
Rio Grande
Water Division
3
Date
9/29/1982
Title
Agenda Item 12b - October 7 1982 - Board Meeting -- Approval to Construct Stage 3 Salvage Wells - Closed Basin Project
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"'<:tit <br />p~" <br />V) <br />~ <br /> <br />'. ' <br /> <br />::.::,; <br /> <br />DESCRIPTION <br /> <br />CONSTRUCT <br />STAGE 1-2 <br /> <br />CONSTRUCT <br />STAGE 1-2 and 3 <br /> <br />Annual benefits <br />Jan. 1979 prices <br /> <br />.:z <br /> <br />$770,000 <br /> <br />$2,202,000 <br /> <br />Cost per acre-foot <br />Jan 1979 prices <br /> <br />$ 80.00 to $ 45.22 <br /> <br />$ 63.37 to t 41.85 <br /> <br />Mitigation <br /> <br />1. No canal water <br />to refuges <br />2. No Russel Lakes <br />land purchased <br /> <br />1. No canal water <br />to refuges <br />2. Initiate Russel <br />Lakes land purchase <br /> <br />Recreation <br /> <br />No development at <br />San Luis Lakes <br /> <br />Develop San Luis <br />Lakes area <br /> <br />Salvaged water that can <br />be used in the Rio Grande <br />. system (acre-feet/yr.) <br /> <br />14,000 to 16,000 <br /> <br />46,500 to 51,000 <br /> <br />Some of our concerns in delaying Stage 3 construction start areas follows: <br /> <br />1. Futttre funding may not be aasured. <br />2. Poor Cost Benefit Ratio <br />3. Increase in cost due to lengthening construction period. <br />4. With no mitigation. project could lose support from other Federal and State <br />agencies. <br />5. Fiscal year budgets for 1984 will be prepared in January and February of calendar <br />1983. <br /> <br />We believe we have complied with all legislation that is necessary for request- <br />ing consent for the start of Stage 3 construction from the Rio Grande Water Con- <br />servation District and the State of Colorado Water Conservation Board. <br /> <br />If we can be of further assistance do not hesitate to contact us. <br /> <br />'~~~~ <br /> <br />Lindell H. Elfrink <br />Project Construction Engineer <br /> <br />Enclosures <br /> <br />1. Control Schedule <br />2. Typical Well field Cross-section (1298-538-401) <br />3. Stages 1-2 and 3 Well Field Layout <br />4. Unconfined Aquifer Groundwater Depths <br />(1298-538-400) <br />
The URL can be used to link to this page
Your browser does not support the video tag.