Laserfiche WebLink
<br /> <br />... <br /> <br />u .. <br /> <br />(d) Enlargement of the existing Sugar Loaf and Twin <br />Lrkr>s Resllrvoh's and the construction of Pueblo Reservoir <br />f,)r a total (;11 "~.W.l sloL'e stol'see capacity of 777,000 acre- <br />feet. <br /> <br />3 <br /> <br /> <br />(e) Facilities for diverting Arkansas River flows into <br />the enlarged Twin Lakes Reservoir. <br /> <br />(f) A pOl,rer system consisting of about 52 ndles of <br />canals, 7 powerplants having a total installed capacity of <br />123,900 kilowatts, 7 switchyards, 7 substations including <br />the existing Gunnison Substation, and a primary transmission <br />network to assure distribution of power to load centers. <br /> <br />(g) Municipal water delivery facilities for furnishing <br />additional water to Colorado Springs, Manzanola, Rocky Ford, <br />La Junta, Las Animas, Lalll!lr, Crowley, Wiley, and Eads. <br /> <br />Construction of the municipal water delivery facilities <br />would be undertaken by the United States only after proof was offered <br />by the communities involved that construction by them would be infeas- <br />ible, and then only after adequate repayment prOvisions had been com- <br />pleted. <br /> <br />Costs and construction <br /> <br />The estimated total construction cost of the Fryingpan- <br />Arkansas Project, based on prices as of October 1958, is $1691905,000. <br />This sum includes past and scheduled investigations costs of illi880,000. <br />Investigations costs of $203,985 financed from Colorado River develop- <br />ment 1'I1nds (nonreimbursable) and $100,000 contributed by the State <br />of Colorado for recent and current work by the Bureau of Reclamation <br />on the Fryingpan-Arkansas Project and for preparation of the report <br />on the Ruedi Il;un and Reservoir Are not included in this sum of <br />$880,000. The total of $169,905,000 also includes the 1'1111 estimatad <br />cost of Ruedi Dam and Reservoir ($12,831,000), .of which $7,600,000 <br />is assignable to the Fryingpan-Jtrkansas Project. <br /> <br />Construction of the project is scheduled over a l3-year <br />period, 1962 to 1974, as shown on the accompanwing Control Schedule. <br />In forlllUlating this SChedule, numerous interrelated factors were con- <br />sidered, including: a systematic sequence of work, legal and 1'I1nd <br />requirements, and capability of the project to provide revenues from <br />water and power deliveries at the earliest practicable time during <br />the construction periOd. <br />