|
<br />,..... '... w I VoL t8. No, 90 I Monday, May 9, 1983 I Notice.
<br />
<br />-
<br />
<br />l"
<br />.~
<br />C.
<br />~
<br />
<br />hit VI. .....u_ c..,.. .......
<br />
<br />SM:tion A. Long. Term Contingent Power
<br />
<br />CoIllinsent C!lpacity Ia capacity whlch
<br />Ie DOnIIally available. except durirra
<br />either forced or pluDed Olltapa drat
<br />aIIect powerplant capabWty, Electric
<br />-"ce _al contraell for Iona-term
<br />_linIont capacity and 6rm InelllY
<br />...... _ lermI and conditions wiU IJll
<br />a<<e.cI to .xi'liDa Boulder Canyon
<br />Project contractoroln the foUowinB
<br />~ta:
<br />
<br />UlNG- TEJIIol ~NT PowER REllEIlYEIl
<br />_ RENEWAl CONTRACT 00nRs TO CUll-
<br />!lENT Bouu>Ert CANYoN PIloJECT CormIAC-
<br />TOIlS
<br />
<br />c
<br />
<br />""'*"""', ~ -"
<br /> -, -. -.
<br />MWD...................... 147,500 -.>12 .'.512
<br />LACWtP ..._......~.H.. "7.175 .,..... 201.151
<br />SCE...........__~..... m.1lOIl 175,_ ......
<br />-- ",000 "'- ....,.
<br />~........,_.. ,,- ...... ,,-
<br />..... ...........-... 1.125 14,11' ...."
<br />APA~......, m_ ...... 'au.,
<br />CAe _ ..1 m_ ...... '.717
<br />-""'..-...... ..- ....... ......
<br />
<br />'....... ..... e.
<br />. KiIcMIIft haIn... _____.
<br />
<br />The reservetion .hown for the City of
<br />Boulder City Include. a renewal offer 01
<br />700 kW and 1.550.000 kWh to the Bureau
<br />of Min... III the event that the renewal
<br />offer to the Bureau of Mine. i. releated.
<br />.uch amounta will be offered to the City
<br />of Boulder City.
<br />Cap.city reduction.. when nece.tar)',
<br />wiU be on a pro rata ba.i. amoDl aU of
<br />the Boulder Canyon Project contracton.
<br />Winter ceaton cap.city will depend
<br />primarily upon Ibe capacity of
<br />seneralin8 unit. removed from service
<br />for malntenanca by Reclamation,
<br />Each Boulder Canyon Project
<br />contractor wiU al.o contractually agree
<br />to supply it. own re.erve. for Boulder
<br />Canyon Project power which meet or
<br />exceed We.tem Sy.tema Coordinating
<br />Council minimum recerve requirementa.
<br />
<br />Section B. Planned Uprating ~ram
<br />
<br />Reclamation i. cWTently plannina an
<br />Uproting Program which would Increase
<br />the ..."eratina capability of the Bould.r
<br />Canyon Project. Reclamation i.
<br />propoaina that the Uprolin8 Program be
<br />R.........! with contributed fund.
<br />provided by the contractor receiving the
<br />allocation. The development and
<br />aubaequent delivery of the uprated
<br />capacity will be conlinsent upon the
<br />contractor finalizina financlJl8
<br />agreement. with Reclamation and
<br />..tiefactory contract alTansementa with
<br />We.tent,
<br />The amount. of capacity and enelllY
<br />in exce.. of renewal offen to be
<br />
<br />.-ved for allocation for UN in tJvt
<br />Boulder City mari<eliDa area within the
<br />Slataa of Arizona, California. and
<br />Nevada _:
<br />
<br /> [ I -.
<br /> - -
<br />.. ,..... .- ..-
<br />--- m_ -- ......
<br />---- ...... ..... 124,000
<br />
<br />I tCIIO.- ..... ill .........
<br />
<br />The State. of Arizona and Nevada
<br />have eatabliobed ....nci.. to contract
<br />for Boulder Canyon Project power.
<br />However, oth.r preference entltie.
<br />within these Statu have adviced
<br />We.tern that they too have the ability to
<br />contract for Boulder Canyon Project
<br />power with We.tern directly, .nd have
<br />reque.ted to be permitted to apply for
<br />power directly with We.tern. In order to
<br />avoid unduly limiling the aUocation
<br />proc.... Weatern will accept
<br />applicatioDl from aU qualifjed
<br />preference entitie. within the.e State.,
<br />and determine their ability to contract
<br />with Weetern durin& the allocation
<br />proce8l. We.tem will .110 accept
<br />applications from qualifjed preference
<br />entilie. within the State of California,
<br />In the event Ibat a contractor or
<br />potential contractor falle to place power
<br />under contract within a ",aoonable
<br />period. a. .pecified by the United State.
<br />and in accordance with the term. and
<br />conditions offered by the United State.,
<br />or falle to provide contributed fund.. the
<br />amount. of power releated by .uch
<br />failure will be reallocated in the
<br />followinB order:
<br />1, Preference entitie. within the
<br />Boulder City markelin8 area:
<br />'2. Preferenca entitie. in adjacent
<br />Federallllf'!<eling area.: and
<br />3, Nonpreference entitle. In the
<br />Boulder City markelin8 area,
<br />The Upraling Program will be
<br />con.trocted in .t..... and i. currently
<br />scheduled to be completed In early 1991,
<br />Power contracta will become effective
<br />on June 1, 1987, and will contain an
<br />..timated schedule for power deliveri..
<br />from the Uprating Program at this
<br />program Ia compfeted,
<br />III the event that any part of the
<br />Upraling Program i. not completed. the
<br />total amount of conlinsent cap. city
<br />inltiaUy allocated to contracton will be
<br />reduced an I proportional ba.i.. Power
<br />recerved for renewal to exi.ting Boulder
<br />Canyon Project contracton will not be
<br />affected. If. .ub.equent to .uch a
<br />capacity reduction. the Upralin8
<br />Program i. reiDotated in whole or In
<br />. part, the amount. initially allocated will
<br />be re.tored to the contracton in
<br />
<br />proportionate amounta at the upraliD8s
<br />are completed.
<br />
<br />Section C. Ene'BY in Exce.. of Finn
<br />Commi_,.
<br />
<br />Boeru senerated in any year of
<br />operaUOII ill .xce.. of 6rm contract
<br />commltmenta (approximltely 0,500
<br />MkWh) shall be delivered in the
<br />follawinB order:
<br />1, The fint200 MkWh for u.e within
<br />the State of Arizona,
<br />2. En"'llY senerated in exce.. of 4,700
<br />million kilowatt hoon (MkWh) .hall be
<br />delivered equally for u.e within the
<br />State. of Arizona, California and
<br />Nevada: Except That in the event
<br />exce.. enelllY in the amount of 200
<br />MkWh I. notlenereted during any year
<br />of operation, Arizona .hall accumulate a
<br />fint right 01 delivery of exce.. enelllY
<br />.ub.equently lenerated in an amount
<br />not to exceed 600 MkWh. Said fint right
<br />01 delivery thall accrue at e rate of 200
<br />MkWh per year for each year exce..
<br />enelllY in the amount of 200 Mk Wh i.
<br />notleneroted. Ie.. amounts 01 exce..
<br />enelllY delivered.
<br />
<br />Section D. Modification Program
<br />
<br />Reclamation Ia .1.0 plannina a
<br />Hoover Modification Program which
<br />would further Increa.e the lenerating
<br />clpability of the Boulder Canyon Project
<br />by approximately 500 MW at rated
<br />head. If developed by Reclamation.
<br />markeliDll of Ibat re.ource will be
<br />addre..ed by We.tern at that time.
<br />
<br />Section E. Capacity Reduction.
<br />
<br />Contract. for Boulder Canyon Project
<br />power will allow for e reduction in
<br />capacity due to generatina unit out8ges
<br />maintenance schedules, at reservoir
<br />drawdown. nu. reduction will be bated
<br />on the ratio each entity'. allocelion or
<br />Boulder Canyon Project capacity bear.
<br />to the total Boulder Canyon Project
<br />capacity marketed. multiplied by the
<br />amount of capacity removed from
<br />service. or not available because of
<br />reduction of effective head,
<br />
<br />Put VB, NODfIrm Pow.. and Other
<br />Apeemeota
<br />
<br />Section A. Short.Tenn Interruptible
<br />Power
<br />
<br />IIltemrptible power may be available
<br />under contract. which permit
<br />r:urtailment of delivery by the Boulder
<br />City AIeL
<br />To dra extent that capacity and
<br />en"'llY in e""".. of long-tenn contract
<br />commitment. become available, .hort-
<br />term interruptible power may be offered
<br />011 an if-, a.-. and when-available basis.
<br />Contact. for .hort.term intelTUptible
<br />
<br />.
<br />
<br />..
<br />
|