|
<br />211M
<br />
<br />hd8aJ ..~ 0" VoL.. No. 110 (Monda;. May 9. 1983 I Notices
<br />
<br />.~.
<br />~
<br />,-
<br />"-
<br />M
<br />
<br />for aIIocaIIan to DlIW and CIII'IeIIt
<br />coallllcton.
<br />Power ...........t far United Stalel
<br />priority use d t8JlAclty and lIIIeID
<br />which is .-.red for Federal
<br />reclamatiOll project -. ad IIrIption
<br />pumplDa 011 certain IDdlan Iuds. Power
<br />tlaat Is _ I ...d lar United Statea
<br />~ _ bat lID! pnIllJ\tIy needed, is
<br />maltrnId III .... of the Parker-Dsvis
<br />PlajM:lcoallllcton eo withdrawable
<br />~.18quata for withdrawals for
<br />Federal rwcIamation project UIO power,
<br />and IndIIIII bription pumping power
<br />bave equal priority.
<br />Federal reclamation project \lie power
<br />is defined for thue Criteria to mean that
<br />capacity and energy which is
<br />established herein for Federal
<br />reclamation projects in the Lower
<br />Colorado River Basin. Such projects are
<br />Federal reclamation facilities
<br />established for the protection and
<br />drainlllle works along the lower
<br />Colorado River. The following is a list of
<br />projects for which Federal reclamation
<br />project \lie power i. relOrved: relift and
<br />drainase pumps, conctruction camp
<br />sites, Yuma-Mesa Irrisation and
<br />Drainage District, Gila Project drainase
<br />pumps. Wellton-Mohawk Irription and
<br />DraiDage District Plant Noc. 1, Z. and 3,
<br />and the Colorado River Front Work and
<br />Levee System.
<br />Power for irriptiOD pumPID8 OD
<br />certain Indian II1II& is defined for the.e
<br />Criteria to mean Federal capacity and
<br />energy e.tablished herein for UlOiD
<br />irrigation pumplD8 on Indian irription
<br />projects which are..djacent to the lower
<br />Colorado River lOuth of Davis Dam and
<br />north of the border between the United
<br />-Slates and Mexico.
<br />When poiority use power ic reque.ted,
<br />Western will eubstantiate that the
<br />power to be withdrawn will be used for
<br />the above epecified purposec, and then
<br />will withdraw the neceuary amount of
<br />power upon a 2-year advance notice.
<br />Withdrawal. of power will be made 81
<br />roque.tad and .ubstantiated until the
<br />total smount of power reoerved for
<br />priorily use purpocea it in use,
<br />Power surplus to that relOrved for
<br />United Slate. priority usee and that
<br />roserved for allocation to the existing
<br />conlracloa will be available for
<br />.'IOO4IIiaa to now or CUJTellt conlractore
<br />in ac:c:orduce with prefenmce
<br />provlalaal of aection lI(c) of the
<br />Reclamation Project Act of 1939, in the
<br />following order of priority:
<br />1, Prefenmce entitiec within the
<br />Boulder City marketing area:
<br />2. Preference entities in adjacent
<br />Federal marketing areal: and
<br />3. Nonpreference entities in the
<br />Boulder City marketing area.
<br />
<br />C'
<br />
<br />In the _ that a coallllctor or
<br />potarltial conllllctor faila to place .uch
<br />power under_ct within a
<br />_ble period. to be de_eel by
<br />tha United Stataa. in accordance with
<br />tho ....... IIIId coodItlODI offered by the
<br />Unltacl Stataa. the lIIIlOUDIc of power
<br />releaoed by auch failure will be
<br />reallocated in accordance with the
<br />precedina preference order.
<br />
<br />Section B, Long- Term Firm Power
<br />
<br />Long-Term Firm Power is intended to
<br />have a..ured availability to the
<br />
<br />contractor within """'lIY limitations
<br />specl!ied in thesa Criteria, The
<br />maximum lOasonal capacity entitlemenl
<br />for long-term firm power shall be
<br />availsble to a contractor during each
<br />month of the ...tee aeuon. The
<br />amount of 0IUIIllJ' uaoc:lated with lons-
<br />tenn firm ~ abaD be the amount of
<br />energy apeclfied in theM Criteria and in
<br />power oaIec contracta,
<br />Parker-Davis Project Long Term Finn
<br />Power capacity allocationc reserved for
<br />current contractor upon receipt of an
<br />Application for Power are a. follows:
<br />
<br />Conn:D . FW. ...... .
<br />
<br />T....
<br />
<br />---
<br />- -
<br />Wit ~.4 .d..1
<br />
<br />T....
<br />
<br />WlnIIr ~.....
<br />- -
<br />... ....
<br />
<br />-.
<br />AEPCD_.._.______.____........
<br />..............-----..--.-..--........
<br />1lEC....................._m_.....___........ m..__......_.....
<br />CfIlIIt......._m........____......._..__m.
<br />GIC~.._..___ 1.100
<br />EAI=B_.__......__...._..............__.__...... '.
<br />ED-3.............._.......____._....._._... 2._
<br />II:L..__....._... ____h...
<br />IAP__..... .____.._..
<br />8CIP .............................__._.._.._...... '...
<br />".,..--.-----..-.-..
<br />WMIDO..__._._. _
<br />VI:l......_.__.__.__...._....__._..........__.__....
<br />"VPO........._.______. 1.135
<br />FIIIT___.~.___._.__.__,
<br />....... 17.ao
<br />-- ...-..--.-..
<br />TDTAL-__.___._ 17.5ID
<br />
<br />21,100
<br />10.450
<br />......
<br />1.100
<br />..-
<br />,.....
<br />
<br />21,100 .........._............
<br />10.450
<br />1.100 ..........__.......
<br />..... ...-..-..-.--.
<br />11.150 4,710
<br />11.215 t,'"
<br />U25 1."5
<br />...... ..-..--....
<br />",'7OD ......__..........
<br />17,1. 1,'"
<br />-.......----....
<br />a,100 _
<br />...............-.......
<br />S.D5 1,t1O
<br />1.110 n..._.__.._...
<br />21"" '''-
<br />..000 .._..__......
<br />253.310 10.110
<br />
<br />11,200
<br />",,00
<br />.....
<br />.....
<br />......
<br />1U50
<br />
<br />16.200
<br />'.000
<br />.....
<br />uo.
<br />41.010
<br />14,130
<br />2,115
<br />2UlO
<br />......
<br />13.130
<br />...
<br />~"5
<br />TOO
<br />--
<br />'.200
<br />
<br />....TOO
<br />".TOO
<br />
<br />'......
<br />
<br />...............-.......
<br />......
<br />3',700
<br />'.....
<br />SIll
<br />.....
<br />ISO
<br />0,3lIO
<br />'..,.
<br />
<br />'.....
<br />.....
<br />
<br />....139
<br />
<br />......
<br />......
<br />"....
<br />...
<br />'....
<br />TOO
<br />.....
<br />1.200
<br />
<br />.......
<br />".TOO
<br />
<br />'74.520
<br />
<br />Energy available to Long Term Firm
<br />Power contractore on and after June 1,
<br />1981, will be equal to 3441 kWh/kW (67
<br />percent capacity factor) in the summer
<br />lOason and 1703 kWh/kW (47 percent
<br />capacity factor) in the winter aeaaon.
<br />Wectern advioed the city of Needle..
<br />California (NeedJec), by lelter elated
<br />January 18. 1879. that the Deputy
<br />Secretart, Department of Energy. had
<br />elected to maka power available to
<br />Needles under eimil.. teno. and
<br />conditioDB eo that which was available
<br />to Needles under __ted Contract
<br />No. 1~ Needle. met the
<br />requirements 10 become a preference
<br />cuatomer.
<br />Western hu reserved for appli~tioD
<br />by Needles the following amoUDIc of
<br />power frvm the Parbr-Davia Project for
<br />the poat-l981 contract period UDder then
<br />CWTeDt contract tenna and conditions:
<br />
<br />-
<br />
<br />5.100........_...__._____ 17 ."-kWh. .....,.
<br />4,014._._..___._.__ 1.'75U53 kWh....
<br />
<br />Section C. Power In ExotJ/U of Amount
<br />Reserved
<br />
<br />Western will allO make available for
<br />allocation to new end current
<br />
<br />contractore the power in excelS of that
<br />relOrved for the exi.ting Parker-Davis
<br />Project contractors and priority uses.
<br />Amounts of .uch power which are
<br />estimated to be available for allocation
<br />after May 31. 1987, are es follow.:
<br />
<br />AIlom<lHAL P_EFl-OAII1S PRoJECT POW.'
<br />AVAILABLE ~ AuOCATlON
<br />
<br />!k.mnw.m
<br />-
<br />
<br />- ~
<br />:::: :.:~::::::~::~::::~:::~~~::~::::~:,~::: =:;;;
<br />
<br />Energy available to Long Tenn Finn
<br />Power conlractore on and sfter June 1.
<br />1987. will be equal to 3.441 kWh/kW (67
<br />percent capacity factor) in the summer
<br />seuon and 1,703 kWh/kW ('7 percent
<br />capacity factor) in the winter seaoon.
<br />
<br />Withdrawable power will continue to
<br />be subject to a 2-ye.. withdrawal
<br />notice. In the event that withdrawals for
<br />priority use purprroes are made
<br />following th,; allocation proceos and
<br />prior to June 1, 1981, the amount of
<br />withdrawable power allocated to
<br />individual contractors win be ~duced
<br />on B pro rata basis.
<br />
|