Laserfiche WebLink
<br />information obtained from Objectives ~-3. Macroinvertebrates will not <br />be collected for two reasons: 1) macroinvertebrate abundance and <br />diversity appear to be adequate in the Price River, since it supports <br />\\goo~" numbers of native fishes and 2) the cost of enumeration/sample. <br /> <br />Obiective 5. Data obtained from Objectives 1-3 (e,g" distribution <br />and abundance patterns of native and nonnative fishes) I basic <br />physicochemical data (Objective 4). additional available physical, <br />chemical, historic and present hydrological .(e.g., frequency, virgin <br />flows, overall contribution to the Green River, etc.), and biological <br />data from the Price River will be synthesized from U.S, Geological <br />Survey, Utah State Department of Health, and other available sources. <br />This information will help determine the overall contribution and <br />biological importance of the Price River to endangered fishes and the <br />importance of the Price River to the Green River system (as compared to <br />other Green River tributaries) . <br /> <br />VII, Task Description (FY 1996): <br /> <br />As outlined above. Each objective represents a task. <br /> <br />VIII. Study Schedule: <br /> <br />'FY-96 : <br /> <br />Tasks 1-4 <br />A field trip summary report for each sampling trip is due 2 <br />weeks following a trip. <br /> <br />An annual report summarizing the historical information and <br />the 1st field season will be submitted in March, 1997. <br /> <br />FY-97: <br /> <br />Tasks 1-4 <br />A field trip summary report for each sampling trip is due 2 <br />weeks following a trip. <br />A draft completion report synthesizing the 2 years of <br />biological data collected in Objectives 1-3 and a synthesis <br />of all available historical information will be submitted in <br />March, 1998. <br /> <br />IX. FY-96 work <br />Description of work: see above <br />Deliverables (due date): see above <br />Budget <br /> <br />1''i-~S96 <br /> <br />UDWR <br /> <br />Labor <br />Travel - <br />Equipment - <br />Total - <br /> <br />$40,000 <br />$ 5,000 <br />$15,000 <br />$60.000 <br /> <br />FY-97 work <br />Description of work: see above <br />Deliverables (due date): see above <br />Budget <br />