My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04531
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04531
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:54 PM
Creation date
10/12/2006 12:25:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111.A
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
2/28/1951
Author
USDOI-BOR
Title
Central Utah Project A Supplement to the Colorado River Storage Project Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SYNOPSIS <br /> <br />Allocations to irrigation, municipal use, and power, all r~imbursable, <br />were made by averaging the results of the alternative-justifiable- <br />expenditure and the priority-of-use methods, with priority given to <br />irrigation and municipal use. <br /> <br />Annual operation, maintenance and replacement costs were allocated <br />to irrigation, municipal use, and power in the same proportion that con- <br />struction costs were allocated. No annual costs were allocated to flood <br />control, recreation, and forest resources' development. Such allocations <br />were not warranted since flood control would result incidentally from <br />project operation for other purposes, recreational annual costs would be <br />paid by local operating agencies from fees collected, and annual costs <br />for features planned for forest resources I development would be negligible <br />and would be paid by appropriations for forest administration. The <br />tentative cost allocations are s\lll\llarized below. <br /> <br />Purpose <br /> <br />Allocations of <br />construction' costs <br /> <br />Allocations of annual <br />operation, mainte- <br />nance, and replace- <br />_ment costs <br /> <br />Reimbursable <br /> <br />Irrigation <br />Munic ipal JJ <br />Power <br />Total reimbursable <br /> <br />. $117;010,000 <br />42~480,000 <br />36.780,000 <br />$196,270,000 <br /> <br />$185,110 <br />60 , 860 <br />458.230 <br />$704,200 <br /> <br />\0' <br /> <br />Nonreimbursable <br /> <br />Flood control <br />Recreation <br />Forest resources' <br />development <br />Total nonreimburs- <br />able <br /> <br />$1,480,000 <br />1,050 ,000 <br /> <br />. <br /> <br />r <br />~ <br /> <br />" <br /> <br />40.000 <br /> <br />r., <br />r <br />ij <br />~ <br /> <br />:U;2, 'fl0,000 <br /> <br />~ <br />~ <br />:;. <br />~~ <br /> <br />To be allocated in <br />investigations for <br />ultimate phase <br />Total <br /> <br />~ <br /> <br />'.,' <br /> <br />5.240.000 <br />*,204,080,000 <br /> <br />11 Includes industrial and other miscellaneous uses. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.