My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04531
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04531
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:54 PM
Creation date
10/12/2006 12:25:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111.A
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
2/28/1951
Author
USDOI-BOR
Title
Central Utah Project A Supplement to the Colorado River Storage Project Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SYNOPSIS <br />. <br /> <br />initial construction and later enlargement. One-stage construction also <br />would obviate interference with initial phase operation that otherwise <br />would result while the dam was being enlarged. <br /> <br />The existing outlet tunnel from the Strawberry neservoir would be <br />enlarged. Below the tunnel outlet, in succession down the west slope of <br />t..e Wasatch Nountain5, would be constructed the Old West power plant, <br />Sixth Water aqueduct, Hanmock power plant, Tanner power plant, Monks <br />Hollow Dam, the Wasatch aqueduct as far as York Ridge near Santaquin, <br />and the Castilla power plant. The Mona-Nephi Canal would be constructed <br />from York Ridge as far south as Salt Creek near Nephi. The Mona Reser- <br />voir would be enlarged, the Elberta Service Pipe would be constructed, <br />and the existing Elberta Canal would be enlarged to distribute water from <br />Mona Reservoir. <br /> <br />Use of Provo River water through exchange in the initial phase would <br />require construction of Bates Dam on Provo River, Hobble Creek Dam on <br />Little Hobble Creek, the Hest Valley Canal, and the Front Dam. Provo Bay <br />would be diked and drained and the upper 7 miles of the Jordan River <br />channel would be enlarged. <br /> <br />j\.n exchange of water between the Bates Reservoir and numerous small <br />storage reservoirs on the upper Provo River would be made to provide <br />supplemental water to areas in the vicinity of Francis and Heber City. <br />Water developing between Bates Reservoir and Hobble Creek Reservoir <br />would be used for supplemental irrigation in the Walls burg area in <br />exchange for Strawberry Reservoir water delivered to utah Lake. A darn <br />would be constructed creating Round Knoll Lake for recreational and fish <br />and wildlife purposes. <br /> <br />New project works to provide water for replacement and expanded <br />irrigation and municipal use in the Uinta Basin would include Hanna <br />Reservoir on the North Fork of Duchesne River, Starvation Reservoir on <br />Strawberry River with a 6.8-mile feeder canal from the Duchesne River, <br />the Upalco Reservoir offstream from Lakefork River, the Stanaker Reservoir <br />with a 3.6-mile feeder canal from Ashley Creek, and the Tyzack Reservoir <br />on Brush Creek. <br /> <br />Existing drains and irrigation laterals generally would be adequate <br />for the project but some rehabilitation of drainage systems would be <br />required in the Spanish Fork and Nephi areas, and new drains would be <br />required in the Provo Bay, Lehi, Vernal, and Jensen areas. Construction <br />of some new distribution laterals and rehabilitation of others would be <br />required in nearly all major irrigation areas. <br /> <br />A pipe line would be required to convey water to communities in <br />eastern Duchesne County. Necessary distribution facilities within the <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.