Laserfiche WebLink
<br />continue throughout the fall and early winter months. <br /> <br />Precipitation in August was 115 percent of normal for the San <br />Juan River Basin above Bluff. This wetter than expected month <br />gave a boost to reservoir inflows. Navajo Reservoir actually <br />gained 24,000 acre-feet of storage during August when normally <br />the reservoir storage is reduced. <br /> <br />It should be noted that the large EI Nino event that is currently <br />being observed in the Pacific equatorial regions is predicted to <br />result in above average precipitation for the southwest this fall <br />season. Therefore, reservoir operational changes could be made <br />this fall season to the flow release as stated above. <br /> <br />Anyone needing further information about the daily operations of <br />Navajo Reservoir should contact Don Fazzan or Rege Leach in the <br />Durango Office at (970) 385-6500. <br /> <br />Glen Canyon - Inflows to Lake Powell were 101 percent of normal <br />in July and are expected to be about 160 percent of normal in <br />August. Streamflows rapidly receded throughout the basin in July, <br />but recent precipitation has increased the flow at many sites. <br /> <br />Glen Canyon Dam releases are continuing at 21,000 cfs and will <br />remain at this level through August 29. Lake Powell inflows are <br />currently at about 10,000 cfs. The maximum lake level occurred <br />about mid July when the lake rose to within 5 feet of full <br />(elevation 3695) and the current level of Lake Powell is about <br />3691 feet. A low flow release of 8,000 cfs has been scheduled <br />for the weekend of August 30 through September 1, 1997 to conduct <br />annual monitoring activities in the Grand Canyon. Releases will <br />be reduced beginning 10 pm Mountain Daylight Time on Friday <br />August 29, 1997, ramping down at 1,000 cfs per hour until 8,000 <br />cfs is reached. Flows will remain steady at this level <br />throughout the Labor Day weekend. Releases will be increased <br />beginning 6 am Tuesday morning September 2, 1997, ramping up at a <br />rate of 3,000 cfs per hour until flows return to about 21,000 <br />cfs. <br /> <br />The Colorado River Management Work Group meetings to discuss the <br />1998 Annual Operating Plan for the entire Colorado River have <br />concluded with a consultation meeting on July 29, 1997. We <br />expect the 1998 AOP to be issued by the Secretary of the Interior <br />by October 1, 1997. Technical subteam meetings are continuing to <br />evaluate the implications of alternative surplus determination <br />guidelines. For further information contact Randall Peterson at <br />(801)524-3715 or Jayne Harkins at (702)293-8190. <br />