My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04460
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:34 PM
Creation date
10/12/2006 12:22:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.980
Description
Colorado River Studies and Investigations - Upper Gunnison/Uncompahgre Basin Water Study
Basin
Gunnison
Water Division
4
Date
11/1/1988
Title
Phase I Feasibility Study for Upper Gunison-Uncompahgre Basin -- Task Memorandum No. 6
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />$1000 to $1200/KW may be attractive to utilities. It appears, therefore, that <br />a pumped-storage project in the study area may be financially feasible and <br />could possibly serve as a financing mechanism for implementation of an <br />':~ in-basin water resource development plan, <br />.... <br />l ') <br /> <br />e-" <br />N <br /> <br />WATER SALES AS A POTENTIAL FINANCING MECHANISM <br /> <br />The possibility of exporting water from the study area to the front range <br />was investigated as a potential financing mechanism for an in-basin <br />development plan. The investigation identified. three previously proposed <br />projects which would divert water to either the Arkansas River basin or the <br />South Platte River basin. These projects are: <br /> <br />o the Collegiate Range Project as proposed by the.City of Aurora; <br />o the Union Park Project as proposed by Arapahoe county; and <br />o the Central Colorado Project as evaluated by the Central Colorado <br />Water Conservancy District. <br /> <br />In addition, a new concept of diverting Upper Taylor River waters from <br />the exi sUng Taylor Park Reservoi r to either the Arkansas or South Platte <br />basins was developed (Taylor Park Project), <br /> <br />The project configuration and yield determined by the developers of the <br />proposed Collegiate Range and Union Park Projects were accepted for. the <br />purpose of compari son. The Central Colorado Project ori gi na lly envi si oned <br />exporting 600,000 af from the Gunnison Basin which was determined by this <br />study to be impractical, Furthermore, the project was originally defined to <br />deliver the majority of its yield to the South Platte Basin which was <br />determined to be economically infeasible at the lower yields determined in <br />this study. As configured in this study, the Central Colorado Project would <br />export only uncommitted Blue Mesa Reservoir water (up to 180,000 af) to the <br />Arkansas River. <br /> <br />A detailed yield analysis of the Taylor Park Project was carried out <br />us i ng vari ous assumpt ions regardi ng water rights, i nstream flow requi rements <br /> <br />S-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.