My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04460
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:34 PM
Creation date
10/12/2006 12:22:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.980
Description
Colorado River Studies and Investigations - Upper Gunnison/Uncompahgre Basin Water Study
Basin
Gunnison
Water Division
4
Date
11/1/1988
Title
Phase I Feasibility Study for Upper Gunison-Uncompahgre Basin -- Task Memorandum No. 6
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c:.""J , <br /> <br />11.0 EVALUATION AND RANKING OF PLANS AND FINANCING MECHANISMS <br />11.1 Alternative Plans <br />11.1.1 Cost Estimates <br />11.1.2 Plan Evaluation <br />11.1.3 Preferred Alternative - Alternative No.5 <br />11.2 Financing Mechanisms <br />11.2.1 Pumped-Storage <br />11.2.2 Transmountain Diversion <br />11.2.2.1 Confirmation Df Preferred Alternative <br />11.2.2.2 Value of Water <br /> <br />~ <br />c) <br />CJ'l <br />W <br /> <br />12.0 PROJECT FINANCING <br />12.1 Introduction <br />12.2 Potential fDr Staged Construction <br />12.2.1 Alternative Plans <br />12.2.2 Pumped-Storage Projects <br />12.2.3 Transmountain Diversion Project <br />12.3 Financing Strategies for Alternative Plans <br />12.3.1 Potential Sources of Revenue <br />12.3.2 Potential Sources of Financing <br /> <br />13.0 ENVIRONMENTAL CONSIDERATIONS <br />13.1 EnvirDnmental Impacts <br />13. 1.1 General <br />13.1.2 In-Basin Reservoirs <br />13.1.2.1 Pauline Reservoir <br />13.1.2.2 Sargents No.3 Reservoir <br />13.1.2.3 Castleton Reservoir <br />13.1.3 Impacts of Alternative Plans <br />13.1.4 Out-Basin DiversiDn Financing Mechanism <br />13.1.5 Pumped-Storage Plan <br />13.2 Mitigation Proposals <br />13.2.1 General <br />13.2.2 Proposals <br />13.3 Future Activities <br />13.3.1 Data Needs <br />13.3.2 Agency CODrdination <br />13.3.3 National Environmental Policy Act <br /> <br />Appendix A - Structural Component Screening Sheets <br /> <br />Appendix B - Taylor Park Project Variations <br />Project Freatures and Cost Estimates <br /> <br />Appendix C - Alternative Plan Screening Sheets <br /> <br />11-1 <br />11-1 <br />11-1 <br />11-8 <br />11-12 <br />11-13 <br />11-13 <br />11-13 <br />11-13 <br />11-21 <br /> <br />12-1 <br />12-1 <br />12-2 <br />12-2 <br />12-2 <br />12-2 <br />12-3 <br />12-4 <br />12-6 <br /> <br />13-1 <br />13-1 <br />13-1 <br />13-2 <br />13-2 <br />13-3 <br />13-7 <br />13-8 <br />13-9 <br />13-13 <br />13-14 <br />13-14 <br />13-14 <br />13-15 <br />13-15 <br />13-16 <br />13-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.