My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04460
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:34 PM
Creation date
10/12/2006 12:22:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.980
Description
Colorado River Studies and Investigations - Upper Gunnison/Uncompahgre Basin Water Study
Basin
Gunnison
Water Division
4
Date
11/1/1988
Title
Phase I Feasibility Study for Upper Gunison-Uncompahgre Basin -- Task Memorandum No. 6
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8.4.2 Project Sizing and Preliminary Yield Estimates 8-3 <br />8.4.3 Delivery Point of Water 8-5 <br />Description of PrDjects 8-5 <br />8.5.1 Central ColDrado Project 8-5 <br />8.5.2 Collegiate Range PrDject 8-11 <br />8.5.3 Union Park Water Supply Project 8-15 <br />8.5.4 Taylor Park Project 8-19 <br />8.5.5 Taylor Park Project Variations 8-22 <br />8.5.5.1 Pump lift Variation 8-22 <br />8.5.5.2 North Route Variation 8-22 <br />8.5.5.3 Arkansas River Delivery Variations 8-23 <br />8.5.5.4 Average Annual Yield Variations 8-23 <br />8.5.6 Evaluation of Taylor Park Project and Variations 8-23 <br />Conventional Hydropower Development 8-25 <br />Screening of Alternatives 8-27 <br />8.7.1 Geologic and Cost Risk Assessment 8-27 <br />8.7.2 Hydrologic and FunctiDnal Reliability 8-28 <br />8.7.3 Environmental Consideration 8-29 <br />'8.7.4 Institutional/Social Considerations 8-.31 <br />8.7.5 Economic Considerations 8-32 <br />8.7.5 Summary 8-33 <br /> <br /> 8.5 <br />el <br />..... <br />, .\ <br />U1 <br />f-.J <br /> 8.5 <br /> 8.7 <br /> <br />9.0 FORMULATION OF ALTERNATIVE PLANS <br />9.1 'Introduction <br />9.2 Methodology <br />9.3 Description of Plan Formulation <br />9.4 Alternative Plan No. 1 <br />9.5 Alternative Plan No.2 <br />9.5 Alternative Plan ND. 3 <br />9.7 Alternative Plan No.4 <br />9.8 Alternative Plan No.5 and 6 <br /> <br />10.0 HYDROLOGIC/WATER RIGHTS EVALUATION OF ALTERNATIVE PLANS AND <br />FINANCING MECHANISMS <br />10.1 Introduction <br />10.2 Alternative Plans <br />10.2.1 General <br />10.2.2 DescriptiDn of Scenarios for Alternative No.2 <br />10.2.3 Water Rights and Operating Rules <br />.10.2.4 Performance of In-Basin Reservoirs, Scenario 2B <br />10.3 Basin Export Schemes <br />10.3.1 General <br />10.3.2 Discussion Df Existing Water Rights <br />10.3.3 Export From Existing Taylor Park Reservoir <br />Under UVWUA Storage Decree <br />10.3.4 ExpDrt From Raised Taylor Park Reservoir <br />Under UVWUA StDrageDecree <br />10.3.5 Export From Existing Taylor Park Reservoir <br />Under New Water Right <br />10.4 Summary of HydrDlogic Modeling <br /> <br />9-1 <br />9-1 <br />9-1 <br />9-3 <br />9-4 <br />9-4 <br />9-5 <br />9-5 <br />9-5 <br /> <br />- 10-1 <br /> <br />10-1 <br />10-2 <br />10-2 <br />10-3 <br />10-3 <br />10-5 <br />10-13 <br />10-13 <br />10-13 <br />10-14 <br /> <br />10-25 <br /> <br />10-30 <br /> <br />10-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.