My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04440
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:29 PM
Creation date
10/12/2006 12:19:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111.A
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
5/1/1984
Author
USDOI-BOR
Title
Diamond Fork Power System
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 5 <br />Long-term Bond and <br />Tax Exempt Commercial Paper (TECP) Issues <br />(OOO's) <br /> <br />Issue <br />Date <br /> <br />To fund <br />construction <br />for <br /> <br />Long-term <br />bonds <br /> <br />1/1/86 <br />1/1/87 <br />1/1/B8 <br />1 /l /89 <br />1/1/90 <br />1/1/91 <br />1994 <br />Totals <br /> <br />$ 349,OBO <br />270,755 <br />418,505 <br />390,190 <br />271 ,665 <br />79,965 <br />$1,223,940 1/ <br />$3,004,100 <br /> <br />1985-1987 <br />1988 <br />19B9 <br />1990 <br />1991 <br />1992 <br /> <br />TECP <br /> <br />$ 144,803 <br />134,625 <br />233,430 <br />247,965 <br />199,600 <br />83,185 <br />o <br />($1,043,635) <br /> <br />1/ The TECP is refinanced in 1994, at the completion of construction with <br />Tong-term bonds. This figure compares with the total of TECP but also <br />includes debt service reserve fund and allowance for bond discount. <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.