<br />PROJECT CONSTRUCTION COST ESTIMATE <br /> <br />Project Construction Cost Estimate <br /> <br />It is estimated that the non-FederallY financed portion of the total <br />construction ccsts for generation and transmission facilities will be 1.2 <br />billion (.january 1983 prices). This estimate is exclusive of interest <br />dUrln!l construction, reserve funds, WO~k]!!.g_<;~.p..Lt~lL..ar1d cost to particu- <br />lar participants such as taxes, regulatory~enses. and contingency and <br />tlnanclng expenses. This estimate includes engineering overhead and <br />miscellaneous costs. These baseline numbers may be helpful to you in <br />calcul ating what the energy and capacity might cost under your specific <br />financing preferences. <br /> <br />Table 4 summarizes the January 1983 construction estimate. The separable <br />costs shown in the table represent the construction costs of facilities <br />whose sole purpose is power generation. The transmission costs include the <br />construction costs of additional transmission lines, switch-yards, and <br />substations needed to del iver Di amond Fork Power to the assumed points of <br />del ivery. The joint costs are the power systems share of the costs of <br />facilities that serve more than one of the Bonneville Unit Project's pur- <br />poses. It is anticipated that Reclamation will offer long-term financing <br />(40 years) for sunk joint costs at 3.222 percent interest. <br /> <br />Table 4 <br />Diamond Fork Power Project <br />January 1983 Construction Cost Estimate <br />Estimated Construction Costs 1/ <br />(OOO's) <br /> <br />Separable costs <br /> <br />$ 738,000 <br />247,000 <br /> <br />Transnission costs <br /> <br />Joint costs to be built <br />(non-Federally fin anced) <br /> <br />Total costs to be non-Federally <br />financed <br /> <br />235,000 <br />$1,220,000 <br /> <br />Sunk joints costs <br />(Federally fin anced at 3.222 percent) <br /> <br />260,000 <br /> <br />Total project costs <br /> <br />$1,480,000 <br /> <br />.l/ Excludes interest during construction, reserve funds, working capital, <br />owner's contingency, and financing expenses. The Federal share of costs <br />for Bonneville Unit pumping requirements has also been excluded. <br /> <br />The construction cost estimates in Table 4 are based upon the following <br />major assumptions, each of which we bel ieve real istic: <br /> <br />1. The project will be constructed according to the existing schedule. <br />To the extent del ays occur on completion dates of project features, <br />those del ays may result in increased project costs. <br /> <br />26 <br /> <br />,I <br />