My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04436
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:28 PM
Creation date
10/12/2006 12:19:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Colorado Mainstem
Date
1/1/1939
Author
Metro Water District
Title
Metropolitan Water District of Southern California - History and First Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />AI ". t' <br />:!.w1-~..J"" <br /> <br />\IETROPOI.IT.-\" V;:\Tf:H nl~TKICT <br /> <br />prOj!'ri;!SS. The contrad was completed on April 16. 1938, except <br />for the remo\.al of some of the contractor's camp builrlin~s. <br />District construction forces were organized in August 1937 to <br />prepare for installation of pumps, motors, and other t-'<luipment <br />as soon as the contmctor was in the clear. A machine shop was <br />erected from buildings moved from the Coachella camp at Berdoo <br />anrl some of the existin!!, buildinj!'s at Di\.ision 3 Were enlarged to .. <br />care for increased crews, :wd to service construction t~luipment. <br />In October the transformer hoist footings were placed and when <br />the swit.('h rack steel erection by the contractor WflS cumpld~t1 in <br /> <br /> <br />-- <br /> <br />- <br /> <br />".~"- <br /> <br />- <br /> <br />- <br /> <br />EfI{f.I,. lI"uflf"i" IlUmpillp; pIma <br /> <br />Xowmber the District employees l>>ej!'an installation of oil circuit <br />brenkers and ek'Ctrical cOllllections. <br />Following completioll and cJcan.up of the pump house interior <br />early in 19:1S the :\0. :\ inlet elbow, pump casings, and valves were <br />moved out of storage into the building and erection was begun, <br />since which time work has l)('t'n actively progressing on all items <br />of I"lluipment installation. By April 193$ the pump settings were <br />so far advanced as to require the sen"ices of the manufacturer's <br />erectin~ engineer, and at the end of the fiscal year were nearin~ <br />completion. In the switch house and at the tnmsfom1er rack elec- <br />trical work is well alon~; J,!ates haw been erectffi in the gate house: <br />construction of the C.lmp water supply is proceedinJl": and the <br />J!"rounds are being landscaped. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.