Laserfiche WebLink
<br /> DAY OF TRANSMOUNT AIN DAY OF TRANSMOUNTAIN <br /> RETURN-FLOW RELEASE RETURN-FLOW USE OR REUSE <br />"___u__u______.__"__"u_._________u_________ __n_ _nu ---------.-- ---------------.--- ~ . <br /> Station 07105500 <br /> -, ~ Station 07105530 ~ :IS"'tion 001 ",cd in original aCcQunting progrnm) <br /> I <br />0200 0200 <br /> I Station 07105800 I <br />f- ror I <br /> 0400 0400 <br />~ I Station 07106000 , <br /> I -, <br />f 100n 1000 <br />r I Station 07106300 , <br /> I -I <br /> 1800 1800 <br /> NOTE: Gaging stations listed in table 1; J <br /> locations shown in figure 2. <br /> Station 07106500 <br /> <br />{}\)0433 <br /> <br />50 <br /> <br />I <br />..... <br />:0 <br />o <br />::;; 40 <br />OJ <br />I <br />..... <br />::;; <br />o <br />a: <br />u. <br />::;; <br />ifi 30 <br />a: <br />..... <br />(f) <br />0.. <br />:> <br />(f) <br />OJ <br />-' <br />~ 20 <br />a: <br />OJ <br />> <br />ii: <br /> <br />10 <br /> <br />o <br />2400 <br /> <br />1200 <br /> <br />....;. <br />~:. . <br /> <br />""." <br /> <br />,,',' <br /> <br />";',' <br />.... <br />". <br /> <br />,'" <br /> <br />2400 <br />TIME <br /> <br />~.' .. <br /> <br />1200 <br /> <br />2400 <br /> <br />Figure 3. Time periods used in computing provisional daily mean discharges at streamflow- <br />gaging stations on Fountain Creek for input to the transit-ioss accounting program. <br /> <br />although the input data are needed on a near real-time <br />basis, the transit-loss computations for a given release <br />day are not made on a real-time basis, and the compu- <br />tation day (\he day after the "use m reuse day" in fig. <br />3) lags the release day by 2 or more days. (At some <br />times, such as during weekends or during periods of <br />highly variable discharge in Fountain Creek, the water <br />comntissioners may not operate the accounting <br />program each consecutive day; thus, two or more <br />computations may be made at one time to bring the <br />computations up to date.) <br />Daily mean discharges input to the accounting <br />program are provisional (subject to revision) because <br />(1) the 24-hour periods that are different from a <br /> <br />midnight (2400 hours) to ntidnight period at some <br />gaging stations (fig. 3) are never used in computing <br />published discharge data and (2) the discharges are <br />computed on a near real-time basis and may be <br />adjusted later with more up-to-date stage-discharge <br />shift data. The resulting error in transit-loss calcula- <br />tion was not considered to be substantial (Kuhn, 1988, <br />p. 88). The TRF and the native return-flow quantities <br />that are input to the program are for a normal 24-hour <br />period to facilitate administration of the TRF use and <br />reuse program. Diversion data that are input also are <br />for a normal 24-hour period, primarily because the <br />quantity of streamflow divened remains fairly <br />constant from day to day. <br /> <br />'" <br /> <br />...-J <br /> <br />.:... <br /> <br />.>,,' <br /> <br />DESCRtPTION OF THE ORIGtNAL TRANSIT-LOSS ACCOUNTING PROGRAM 7 <br />