My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04343
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:59 PM
Creation date
10/12/2006 12:17:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.325
Description
Wild and Scenic-Gunnison River-Curecanti Unit
State
CO
Basin
Gunnison
Water Division
4
Date
12/1/1986
Author
WBLA inc
Title
Gunnison-Curecanti-Curecanti Instream Flow Water Rights Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />r': ,,', r, <br />V _&..0' ~.' .:J <br /> <br />I <br /> <br />28 <br /> <br />I <br /> <br />III. Scenarios <br /> <br />I <br /> <br />A. Primary Scenarios <br /> <br />i <br /> <br />SiH primary scenarios were analyzed: <br /> <br />I <br /> <br />Scenario 1: This scenario generally portrays eHisting conditions and <br /> <br />I <br /> <br />operations, eHcept that junior hydropower diversions at the Gunninson <br /> <br />Tunnel are assumed. <br /> <br />Irrigation diversiorls through the Gurlrdsc,n Turlflel are <br /> <br />I <br /> <br />set to historic values and an instream flow of 200 cfs below the Gunnison <br /> <br />I <br /> <br />Tunnel is supported with Blue Mesa storage releases including releases to <br /> <br />make target levels. No direct flow water right priority is assumed for <br /> <br />I <br /> <br />instream flow purposes~ <br /> <br />I <br /> <br />Scenario 2: Instream flows below the Gunnison Tunnel are protected under <br /> <br />I <br /> <br />the P&M priority in the amount of 300 cfs, while Blue Mesa storage <br /> <br />releases to support instream flows are made under the eHisting 200 cfs <br /> <br />I <br /> <br />criterion. As in Scenario 1, Blue Mesa storage releases are made to <br /> <br />support a 200 cfs instream flow whenever Blue Mesa storage is above <br /> <br />I <br /> <br />target. These releases would be made in any case, and would be available <br /> <br />I <br /> <br />to the P&M water right in priority. The P&M water right would then pick <br /> <br />up any other releases above target (not dedicated to the 200 cfs instream <br /> <br />I <br /> <br />flow) and any other unappropriated water below Crystal available in <br /> <br />priority up to 300 cfs. Blue Mesa storage releases may also be made under <br /> <br />I <br /> <br />I <br /> <br />WBLA, Inc. 1909 Broadway, #3, Boulder, Colorado 80302 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.