My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04289
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:44 PM
Creation date
10/12/2006 12:15:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543
Description
Closed Basin Division
State
CO
Basin
Rio Grande
Water Division
3
Date
1/1/1979
Title
Fish and Wildlife Mitigation and Enhancement Plan - Closed Basin Division - San Luis Valley Project - Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />('-l <br />'lI"'</ <br />:') <br />C:J <br /> <br />('1 <br /> <br />of additional lands east of the channel, and effects resulting from project <br />pumping on Blanca liliA. Two artesian wells with a combined capacity of 190 <br />gallons per minute (gal/min) will be needed to accomplish annual delivery of <br />the adjudicated 307 acre-feet of water right on the w. 1/2 sec. 4, T. 38 N., <br />R. 12 E. <br /> <br />The 2,040-acre tract of Emperious Estate land will be acquired in fee with <br />appurtenant water rights. The existing wells on the Emperious lands are <br />estimated to be presently flowing about 1,500 acre-feet/yr. Approximately <br />800 acre-feet of artesian water rights will be transferred to Alamosa NWR to <br />partially mitigate project effects. Approximately 700 acre-feet/yr would con- <br />tinue to flow on the Emperious lands to maintain the resource of value in <br />terms of livestock grazing and waterfowl production. One artesian well with <br />a capacity of about 2,000 gal/min will be needed to accomplish, in approxi- <br />mately a 3-month period, the annual delivery of 800 acre-feet artesian water <br />at Alamosa NWR. <br /> <br />Funds to accomplish the construction of the above wells will be provided. <br /> <br />H. Monitoring <br /> <br />A monitoring program to establish preproject conditions on Blanca WHA and the <br />effect of drawdown pumping on existing ponds and wetlands during project opera- <br />tion should be accomplished. Water and Power and BLI1 representatives would <br />cooperatively develop such a program and the degree of participation of each <br />organization. <br /> <br />IV. Incidental Benefits <br /> <br />Due to the fact that the mitigation plan is designed to replace wetlands rather <br />than waterfowl production, the implementation of the plan would have substantial <br />incidental benefits in the form of waterfowl production and hunting <br />opportunities. Benefits resulting from the increased waterfowl production and <br />the associated man-days of hunting are shown in table 9. <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.