My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04237
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:24 PM
Creation date
10/12/2006 12:12:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.130
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/21/1986
Title
Authority of Mesa County Irrigation District and Palisade Irrigation District to Contract Pursuant to Colorado River Basin Salinity Control Act
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />('.,1 <br />ex> <br /> <br />c <br />o area could be organized. Such research resul tE.d in our report <br /> <br />organizations into which irrigation laterals in the Grand Valley <br /> <br />\......J <br /> <br />dated June 10, 1995, entitled Formal Organizations for Operation <br /> <br />of Laterals in the Grand Valley Unit of the Colorado Basin <br /> <br />Salinitv Control Project (referred to below as our "Prior <br /> <br />Report"). We have attempted to limit duplication of the material <br /> <br />contained in our Prior Report in this report, but we should like <br /> <br />to have our Prior Report considered as being incorporated herein. <br /> <br />The initial phase of the present legal work requires our <br /> <br />opinion as to whether amendments to applicable state statutes or <br /> <br />organizational documents of each District are n'~cessary in order <br /> <br />for the Districts to be Contracting Districts. The results of <br /> <br />such initial phase are required to be submitted by the Districts' <br /> <br />legal counsel by August 1, 1986. The following report sets forth <br /> <br />the results of our performance of the initial phase of the legal <br /> <br />work under the June 20, 1986 contract. <br /> <br />II. ASSURANCES THAT ALL COST OF OPERATION <br />AND MAINTENANCE WILL BE REIMBURSED <br /> <br />While not precisely covered by the scope of legal work <br /> <br />required in the June 20, 1986 contract, a problem exists which is <br /> <br />of sufficient importance to both of the Districts that we believe <br /> <br />it should be addressed in this report. Because the problem bears <br /> <br />directly on whether a Salinity Control Contract can be negotiated <br /> <br />with either District, we believe it deserves preliminary <br /> <br />consideration. <br /> <br />It is the present position of the Boards of each District, <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.