My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04237
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:24 PM
Creation date
10/12/2006 12:12:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.130
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/21/1986
Title
Authority of Mesa County Irrigation District and Palisade Irrigation District to Contract Pursuant to Colorado River Basin Salinity Control Act
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,""'" <br />~ <br />00 <br />U interests in property as may be required in order to carry out the <br />o <br /> <br />c;:\ <br /> <br />purposes of this Section. <br /> <br />If the compensation to be paid for the <br /> <br />taking or acquisition of interests in property by a Contracting <br /> <br />District is to be paid or reimbursed by the United States, payment <br /> <br />thereof need not be submitted to a vote by the qualified voters of <br /> <br />such district. Similarly if payments required under contracts <br /> <br />made by a Contracting District for construction, improvement, <br /> <br />supplying of materials, operation or maintenance of facilities in <br /> <br />implementation of a Salinity Control Contract are required to be <br /> <br />paid or reimbursed by the United States, such contracts need not <br /> <br />be submitted to a vote of the qualified voters of the Contracting <br /> <br />District nor, except to the extent required by the Salinity <br /> <br />Control Contract, need such contracts be submitted for bids before <br /> <br />the execution thereof, any statute to the contrary notwithstand- <br /> <br />ing. <br /> <br />(4) If, and to the extent, title to property acquired by a <br /> <br />Contracting District is required to be transferred or conveyed to <br /> <br />the United States under a Salinity Control Contract, a Contracting <br /> <br />District shall have power and authority to make such transfers or <br /> <br />conveyances without the necessity of approval thereof by a vote of <br /> <br />the qualified voters of the said District. <br /> <br />(5) A Contracting District shall not be required to submit <br /> <br />to the state engineer or irrigation district commission a plan of <br /> <br />a project to be constructed or operated and mai:~tained under a <br /> <br />Salinity Control Contract, to supply other information concerning <br /> <br />the project to the state engineer or irrigation district <br /> <br />-21- <br />
The URL can be used to link to this page
Your browser does not support the video tag.