Laserfiche WebLink
<br />1 <br />f <br /> <br />J <br /> <br />a. Upper Diversion Structure $2,390,000 <br />b. Lower Diversion Structure 990,000 <br />c. Bypass Pipeline 3,610,000 <br />d. Access Road and Water Rights 2,500,000 <br /> Subtotal $9,490,000 <br /> <br />] <br /> <br />j <br /> <br />~ <br /> <br />J <br /> <br />SUMMARY <br /> <br />] <br /> <br />The proposed alternative without further investigation <br /> <br />) <br /> <br />appears viable. However, in order to determine feasibility of <br /> <br />the evaporation system, a detailed study of the basin and the <br /> <br />., <br /> <br />proposed sealing materials to be used, must be completed. <br /> <br />~ <br /> <br />In order to improve the quality of the water available in <br /> <br />1 <br />~ <br /> <br />Washington County, the Washington County Water Conservancy <br /> <br />1 <br /> <br />District is interested in participating and possibly owning and <br /> <br />operating the desalting facility. However, the area of benefit <br /> <br />of the removal of the salts greatly exceeds the boundaries of <br /> <br />Washington County, and therefore, the costs should also be <br /> <br />shared by the greater area. <br /> <br />The Washington County Conservancy District has funded and <br /> <br />is currently in the design process for the construction of the <br /> <br />Quail Creek Reservoir. <br /> <br />The estimated cost of the facility is <br /> <br />I <br />I <br />I <br /> <br />('- ,':")r:;S3 <br />.' L...v <br /> <br />P6/L9 <br /> <br />CREAMER AND NOBLE ~N.~DNSULTING ENGINEERS <br />