My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04137
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:56 PM
Creation date
10/12/2006 12:10:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
3/10/1971
Author
CWCB
Title
Statement of Robert E Evans Project Manager Fryingpan-Arkansas Project Before Colorado Water Conservation Board
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Slide U - <br /> <br />Slide ZZ - <br /> <br />Slide Z3 - <br /> <br />Slide Z4 - <br /> <br />SUde ZS - <br /> <br />.' <br /> <br />Slide Z6 - <br />Slide Z7 - <br />SlideZ,a - <br />Slide Z9 - <br /> <br />1783 <br /> <br />. <br /> <br />. <br /> <br />Pueblo Dam -- an artist's rendering superimposed on a <br /> <br />photograph. The first contract was awarded in .June to include <br /> <br />loundation, work only for $5. 143.000. Work is now in progre81 <br /> <br />on: <br /> <br />Cutofl trenches and grout curtain under earth-fill portions <br /> <br />of dam. . . <br /> <br />Foundations for concrete buttresses are outlined in the rock <br /> <br />formations. The old barrier dam will be inundated.':. <br /> <br />The spillway stilling basin is cut out of rock. Buttress <br /> <br />excavation in loreground. .. <br /> <br />The river channel has been excavated to bedrock and a 33,000 <br /> <br />cubic yard concrete plug is now being placed in this hole. Overall <br /> <br />the contractor is on schedule and expects to complete the founda- <br /> <br />tion phase of the dam construction by December 1971. Funds to <br /> <br />start the second contract at Pueblo Dam are not part of our budget " <br /> <br />for Fiscal Year 1912. <br /> <br />To meet environmental needs. now a topic of keen interest, <br /> <br />we are doing many things to cover up our tracks. Here are some. .. <br /> <br />Cut slopes are being revegetated on permanent roads at Ruedi. <br /> <br />On tougher cuts and fill. Aspen mats a.re used to provide a mulch. <br /> <br />Temporary roads a.re being obliterated and natural cover restorec <br /> <br />Borrow areas ar~ beitig revegetated and reforested at Turquoise <br /> <br />Lake... <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.