|
<br /> TABLE 16 (continllt:'d)
<br /> D1STRIIIUTlON SYSTEM CONDUITS ~,
<br /> LENGTH FEET TOTAL COST (;'j
<br /> Cut Cast Asbes. Date ,,",,)
<br />Spec. Contr, Sched. location Dia, Tunnel Precast In Place Steel Iron ,.. Total Per Ft. Cllmpleted Miles
<br />ORANGE COUNTY FEEDER W
<br />335 478 34P La Verne-Walnut 42&39 33,200 $ 427,023 , 12,86 7/28/41
<br />335 478 35P Walnut.Brea 36 46,599 580,508 12.46 7128/41
<br />335 478 36P Brea.Anahe,m 36 20,044 254,352 12.69 7128/41
<br />335 479 37Se Anahelm.Santa Ana.,.. 37&34 46.190 775,475 16.79 5/27/'11
<br />359 506 42R&42S Santa Ana-Corona Del Mar 36.12 11.028 55,901 1,096,059 16.38 2/11/44
<br />417 569 42P Replaced8042'ofabove 36 5,833 2,218 181.451 22.54 6/25/53
<br /> Subtotal 116,704 104,309 3,314,868 15.00 41,86(221,013'}
<br /> Abandoned'in'j;lace' -8,042
<br /> Total Orange County feeder 108,662 104,309 3,314,868 15,56 6/25/53 40 34(212.971'}
<br />MIDDLE FEEDER
<br />485 648 56SC La Verne-Grand Ave. .... 73 29,434 2,658,116 90.31 1/23/58
<br />'" 648 57SC Grand Ave.-Baldwin Park" 73 24,951 2,664,489 106.79 1/23/58
<br />491 653 58SG Baldwin Park.S.B. Freeway. 73 20,872 2,234,598 107,06 2/1/58
<br />491 653 59SC S.B, Freew...y.S. San Gabriel 73 20,299 2,135,297 105.19 2/1/58
<br />498 657 59A.P S. San Gabriel-Garvey Res. 72&73 14,805 1,260 2,252,100 140.17 J/ 5/58
<br />416 568 48P Garvey Res.-Washmgton 72 11.470 941,010 82.04 10/15/54
<br />416 568 49SG Washmgton-Soulhern 73 31,023 3,032,752 97,76 10/15/54
<br />403 550 m S...nla Ana Freeway 73 270 34,302 127.04 8121/52
<br />421 574 50Se Southern.Vietoria 73 40,990 3,656,691 89,21 10125/54
<br /> Tolal Middle Feeder 26.275 169,099 19,609,355 10037 3/ 5/58 37.00(195,374')
<br />PALOS VERDES fEEDER
<br />225 348 21SC Eagle Rock-Ascot T. 55 28,927 917,599 31.72 3/26/39
<br />225 348 22SC Ascot T.-Santa Fe Ave'. 51 28,384 864,867 30.47 3/26/39
<br />225 348 23SC Santa Fe Ave.-98th St. . ..., 51 34,465 953,641 27,67 3/26/39
<br />28J 410 24SC 981h Sl.-Dominguel Channel 51 35,937 672,818 18.72 10131/39
<br />283 410 25SC Dominguez Chnl..Pa1. Ver. R. 51 35,359 659,970 18.66 10/31/39
<br /> Total Palos Verdes Feeder 163,072 4,068,895 24.95 10/31/39 30.88{l63,O72')
<br />SANTA MONICA FEEDER
<br />189 306 12C Eagle Rock Can, x-ing 84 533 85.444 160.31 12/11/38
<br />107 190 T San Rafael Tunnel NO.2 120 5,669 64,26 10/15/37.
<br />328 471 29P San Rafael NO.2-Verdugo 58 12,818 339,176 26,46 1/15/41
<br />328 472 30Se Verdugo-Burbank "....,., 49 22,'123 517,673 25.76 5/17/41
<br />333 <is 31P Burbank.Hollywood Tunnel 42 30,670 643,682 20.99 7/ 2/41"
<br />329 470 T Hollywood Tunnel n 3.732 162,272 4348 5122/41
<br />333 476 32CI Hollywood Tunnel-B'everly'i-ilils 32 25,0:20 452,584 18.09 7/ 1/41
<br />333 476 32CI Beverly Hills-Santa Monica 28 28.445 412,278 14,49 71 1/41
<br /> Total Sant... Monica Feeder 9,401 43.488 533 22,423 53,465 ",673,109 20.67 7/ 2/41 24.49(129,310')
<br /> 'Cos! combined with San Rafael Tunnel No. l.
<br /> "Includes 780 teet welded steel pipe under Cahuega Freeway.
<br /> ,.
<br /> f
<br /> ..
<br />
|