|
<br /> TABLE Hi
<br /> DISTRIBUTION Sl'STUI CONDUITS
<br /> June 30, 1961
<br /> lENGTH FEET TOTAL COST t.J
<br /> Cast Cast Asbes- Date FeetCiJ
<br />Spec. Contr. Sched. Location Dia. Tunnel Precast In Place Steel Iron 'os Total Per Ft. Completed Miles
<br />UPPER FEEDER (.0
<br />137 235 IP CaJalco-Arlington 140 12,227 I 652,542 $53.15 12123/37 .Cf)
<br />137 23. 2S Arlington.Jurupa 13B.116) 54,530 4,721,755 86.59 H/24jJ7
<br />137 236 2. (Santa Ana R, nridge)' )
<br />137 2J5 3P Jurupa-Fonlana 140 20,124 1,217.412 60.50 12/23/37
<br />115 225 4P Fonlana-Rochesler 152 25,867 1,292,746 49.98 6/18/37
<br />115 225 5P Rochesler-Ontario 152 24,892 1,146,064 46.04 6118/37
<br />134 230 .P Ontario.Claremont 140 27,294 1.506,615 5520 5/24/38
<br />134 230 7P Claremont-San Dimas 140 29,950 1.711.839 57.16 5/24/38
<br />115 226 8P San Dimas.Glendora 123 24,529 1,484,952 60.54 3/17/37
<br />77 146 T MonrOVia Tunnel NO.1 120 7,868 665,615 75.57 5'17/37
<br />77 146 T Monrovia Tunnel NO.2 120 940
<br />189 30' 8e San Gabriel R. .l-ing 11. 520 182,928 351.78 2/ 8/39
<br />77 14. T MonrOVia Tunnel NO.3 120 32,105 2,486,154 77.44 10/10/38
<br />189 306 ge Monrovia Canyon .l.ing 116 600 113,1]6 18B.56 2/8/39
<br />10] 190 T Monrovia Tunnel No.4 rvladre 120 8,133 841,899 103.52 7/12/38
<br />154 270 9P MonrOVia No, 4-Slerra 116 8,691 458,327 52.74 10/31/38
<br />110 195 T Sierra Madre Tunnel 120 6,700 462,156 68.98 10/31/36
<br />154 270 lOP Serra Madre Tunnel.E. Pasadena 116 10,517 531.152 5050 8/13/37
<br />110 196 T Pasadena Tunnel Ed. 120 5,604 413,652 73.81 11/24/36
<br />77 147 T Pasadena Tunnel 120 12,140 1,049,873 86.48 4/23/37
<br />154 270 lIP Arroyo Seco x'lng 116 4.127 301.468 73.05 11/27/37
<br />107 190 T San Rafael Tunnel No. 120 4.047 624.364 64.26 10/15/37
<br /> TolalUpperFeeder 77,537 188,268 ],120 54,530 21,864.649 68.02 2! 8/39 60.88(321.455)
<br />LOWER FEEOER
<br />413 564 T Cajalco Tunnel 12P,.4 7.540 1.674,707 222,ll 11/1;54
<br />438 596 70P CajalcOTunnel--':C:orona 108 20,510 2,528,858 123.30 6; 6/55
<br />438 597 71P Thru Corona 108 23,976 2,224,357 92.77 8/1/55
<br />455 606 72P Corona.Santa Ana Canyon 108 13,838 1,774,902 128.26 4/18/56
<br />455 '06 73SC Across Santa Ana River 109 12,972 2.755,644 212.43 4/18/56
<br />455 .07 74P S. A, River.San Juan Tunnel. 108 11,802 1,585,327 134,33 3/5/56
<br />437 595 T San Juan Tunllel 1211/4 6,795 1,695,158 249.47 1/10/56
<br />4.1 613 75P San Juan Tunnel.Ccint'.'To~er' 108 4,126 750,605 181.92 8/20/56
<br />524 703 76SC Sta. 1031+17 _1279+00 97 24,785 4.123,098 166.35 5/13/59
<br />524 703 nsc 51a. 1279+00 - 1528+00 97 21.697 4.801.789 221.31 5/13/59"
<br />524 703 78SC 51a. 1528+00 - 1816+00 97 28.853 5,527,909 191.59 5/13/59"
<br />480 .34 795C La Habra Rd -Norwalk Blvd. 79 28,804 3.179.638 110.39 7/16.157
<br />480 .35 80SC Norwalk Blvd..Garfield Ave. 79 32253 4.801.150 14886 7/10/57.
<br /> Tolal Lower Feeder 14,335 74,252 149,364 37.423,142 157.27 5113/59 45.07(237,951)
<br />'These include cosls of pressure conlrols-Sched. 77SC-$312,847; Sched 78SC-$1.174.249; Sched.80SC-$594,302. Tolal = $2,081.398 ullder Specifications 566. Contracl
<br /> 733.
<br />
|