My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04075
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:36 PM
Creation date
10/12/2006 12:06:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.751
Description
Colorado River Operations
Basin
Colorado Mainstem
Date
10/1/2001
Author
USDOI/BOR
Title
Scoping Summary Report, Implementation Agreement, Inadvertent Ovverun and Payback Policy and Related Federal Actions Environmental Impact Statement
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Scoping Summary Report <br /> <br />measures, would not jeopardize U,e continued existence of any threatened or endangered <br />species. These conservation measures, which are associated with the water transfers identified <br />in the lA, require NEPA compliance documentation before they can be implemented by <br />Reclamation. The EIS will provide such documentation at a programmatic level, based on <br />available information. <br /> <br />1.3 NATIONAL ENVIRONMENTAL POLICY ACT <br /> <br />NEP A establishes a general framework for evaluating environmental impacts prior to <br />undertaking a Federal action. NEPA requires public disclosure about the environmental <br />impacts of, and alternatives to, discretionary major Federal actions significantly affecting the <br />environment. Seoping is one of the first steps in the process, followed by issuance of a draft EIS <br />and a 45-day minimum public review and comment period, including holding public hearings. <br />All public comments submitted prior to the close of the public review and comment period are <br />considered. The draft EIS is modified, as determined appropriate by Reclamation, and is then <br />issued as a final EIS. A Record of Decision regarding the action cannot be made for at least 30 <br />days after the issuance of a final EIS. Reclamation is tile lead Federal agency for the EIS on the <br />IA, lOP and conservation measures, and will make the decisions regarding the project, pursuant <br />to direction by the Secretary. <br /> <br />4 <br /> <br />LA, lOP alld Related Federal Actiolls EIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.