<br />~RYINGPAN~ARKANSAS PROJECT, COLORADO
<br />
<br />65. The to(,a] irriglltion water supply to' be' made' avai]able by th.;
<br />project would consist of imported water, conserved flood 'f1ows, private
<br />supplies reregulated in project reservoirs, and l~sflble return flows.
<br />Rercgulated priYitte sllpplies include some winter Bows of the
<br />Arknnsas River that are presenUy diverted' for direct-flow use but
<br />which by agreement, could be con vcrted to more beneficial summer'
<br />use. U;rough storage in the Pueblo Reservoir, Ret,urn flows of the
<br />project munieiplll water are est,imllted at 70 percent. The total
<br />irrig-Iltjon helldg-Ilte supply is estimated at .50 percent more than tbe
<br />initial supply, bl\scd upon successive reuses of the water at tbe rate
<br />of 40 percent return flow from each appliclltion, The next table sbows
<br />tbe souvce of wllter to be made availab]e for the Arkansas Valley,
<br />reconst.ructed as annulllaverages for the 1911--44 period of study.
<br />
<br />[Thousand!! of acre.!elltj
<br />
<br />Source 0",,, I Losses N,. Helldp;ll.ta
<br />lupply
<br /> -
<br />Frylo~p:J.n dlve~ion.. _____un. .____._________.______~___ n___ !l9.2 ].~. .'I ~'.7 --._---..-
<br />Arbasas River Bood9__.___u__n____________._________________ >0.0 32.0 18.0 un._n._
<br /> - - - -
<br />TrJtf\l projectwllteru...___________________._____________ l1Q.2 47." 71.7 __ - - u__ ~ .
<br />Le99muoiclpal water_________._____._______________u_________ 15.0 ___.._u__ U.O --------.-
<br />Project Irrli!'atlonsllpp11_________.._________________.___ --;0.:'1--';:' ".7 ".1
<br />Mllnldpfll rHunJ flow, Arkansas Vlllley________u_________.____ 7.0 2_~ .., ,.7
<br />Additional Twin Lakes di.ersion__.______._________n_________ H..g 2.4 12_ ~ 18.8
<br />Cunvert{'d winter 6oW'________________________u______________ '9J.O 19.0 74_0 74.0
<br /> - - - -
<br />Total wlllev irrlo:atlnn 51lpplY.__._________________h_n__ 2111.1 71.4 141_7 184.~
<br />Trlbutory municipal return 6<lw________________.______________ ---------- n ------- 3.0 .5.2.
<br /> - - - -
<br />Total WUl.blE: iTTi~!I,tiUD slIpply__.____ _ ____u______________ ________u ---_.----- IM.2 189.8
<br />
<br />I
<br />.
<br />
<br />FINANCES AND PROJECT OPERATION'"
<br />
<br />66. Based -upon preliminary designs. and upon prices prevailing in
<br />October 1949, the cst.imated con.truetion cost of tbe project i~
<br />$147,440.000, Abont 25 percent of that cost would be for western
<br />slope struct,lIres and the transmolllltain tUllnel Tbe Ilnnnal oper-
<br />ation, maintenance, and replacement expense is estimated to be
<br />$1,335,200,
<br />
<br />."",,"
<br />
<br />Construction
<br />000'
<br />
<br />AnnUdloper--
<br />lI.t1on,ma(n.
<br />ten!lJlCfl, and
<br />replacement
<br />
<br />DolIl.! and resl'rvo1r9__n.___ ___.h____.____,___.______n_.__n__ ______ __'._ ,~.334,OOO 130,7i"J(l
<br />DiversIon mnals and oonduJts_.___. .______.u_._. _____.____ .--___ _u__._.. 30.41111,000 M,87lJ
<br />Power features _ ________ ___._____________.__h_.h___________n__._._.__.__ 34,011. 000 Me, ll9(l
<br />MunlClpo.lsupply 5}'stllms_______ _____.________h..__ ________ 13,050,000 !Ol,MIl
<br />Operation and maintenance durmg co~LrUCtlOD __ ___.____________._______ .5M.OOO 0
<br />-~--:---
<br />TotaL___...___nnn_____.h____.__.________u__...nh..---------_-- 1.t7,'"0,(XlQ 1,~XlO