Laserfiche WebLink
<br />("" <br />'. 1 <br />.;~, D. Furrow and Border (7 irrigations) <br />...-\ <br /> Hour Requirements by <br />.' <br />("-, <br />~ <br /> 1- Expected water penetration EL-l EL-2 EL-3 EL-4 <br /> a. Determine net irrigation <br /> 7 irrigations 7.0 hr 7.0 hr 1.75 hr 1.30 hr <br /> b. Soil water holding <br /> capacity 2.0 hr 2.0 hr 1.0 hr 0.75 hr <br /> 2. Compare actual water <br /> penetration to expected <br /> make adjustments 1.25 hr 1.25 hr 1.25 hr 1.25 hr <br /> 3. Explain differences 1.50 hr 1.50 hr 1.50 hr 1.50 hr <br /> 4. Check intake values <br /> 7 sets of figures 3.00 hr 3.00 hr 2.00 hr 1.00 hr <br /> 5. Compare design intake <br /> values to actual date 2.00 hr 2.00 hr 2.00 hr 2.00 hr <br /> 6. Explain problem area 2.00 hr 2.00 hr 2.00 hr 2.00 hr <br /> <br />1. Figure crop cons. use <br /> between irrigations 4.00 hr 3.00 hr 1.25 hr 1.00 hr <br />2. Initial soil moisture 1.50 hr 1.00 hr 0.30 hr 0.30 hr <br />3. Final soil moisture u.75 hr 0.75 hr 0.75 hr 0.75 hr <br />4. Effective rainfall 2.00 hr 2.00 hr 1.00 hr 1.00 hr <br />5. Gross water application <br />6. Gross tail water <br />7. Deep percolation 4.00 hr 4.00 hr 4.00 hr 4.00 hr <br />8. Plot cons. use 3.00 hr 3.00 hr 3.00 hr 3.00 hr <br />9. Suggest system adjustments 4.00 hr 3.00 hr 3.00 hr 2.00 hr <br /> 38.00 hrs 34.50 hrs 22.8e) hrs 19:'45 hrs <br /> <br />54 <br />