My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04027
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:21 PM
Creation date
10/12/2006 12:05:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449
Description
Platte River Studies
State
CO
Basin
South Platte
Date
3/1/1993
Author
TEC
Title
Project Manual for Peterson Dam
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4. RFJECTED - Signifies material or equipment represented by the submittal does <br />not conform with the design concept to comply with the information given in the <br />Contract Documents and is not acceptable for use in the Work. Contractor is to <br />submit material or equipment responsive to the Contract Documents. <br /> <br />s. SUBMIT SPECIFlED ITEM - Signifies material or equipment represented by <br />the submittal is not the item specified in the Contract Documents and is not to be <br />incorporated into the Work. Contractor is to submit only the material or equipment <br />specified in the Contract Documents. <br /> <br />C. Engineer will return the number of copies of submittals specified below depending on the <br />action taken: <br /> <br />i~~frt..~!..~~I~Hf <br />.... ...i....................... .. ........ i-. ....... <br />..... .. . . <br />..... ..... ........ <br />.. , ... . <br />.. ".. ... <br /> <br />. .. ... . . <br />. .... ....... ... <br />.....No;Retarned> <br />.. .... <br />. .- .. ... . <br />.... ..byEngirieer .... <br /> <br />~J1::dt;~.r~:~~e:s%~, <br /> <br />No Exception Taken 3 3 0 <br />Make Corrections 3 3 0 <br />Noted <br />Revise and Resubmit I 5 6 <br />Rejected I 5 6 <br />Submit Specified Item · I 5 6 <br /> <br />"Only one (I) copy of the submittals returned to the Contractor marked with these actions will be <br />stamped annotated. <br />if a reproducible transparency is submitted, Engineer will return the transparency with the stamp <br />and annotations. <br /> <br />IC.S. DISTRIBUTION <br /> <br />A. Distribute reproduction or copies of Shop Drawings which carry Engineer's stamp of <br />acceptance to the Contractor's personnel, the job site file, the project record document file, <br />the subcontractors, the suppliers, the manufacturer and other affected contractors. <br /> <br />B. Distribute samples which carry Engineer's stamp of acceptance to the project record file and <br />the affected supplier or manufacturer. <br /> <br />.... END OF SECTION .... <br /> <br />IC-6 <br />92-<l24 <br /> <br />I <br />I <br />I <br />I <br />J <br />I <br />I <br />J <br />t <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.