Laserfiche WebLink
<br />TABLE OF CONTENTS <br /> <br />Page <br /> <br />INTRODUCTION 1 <br /> <br />Study Objective 2 <br />Study Area 2 <br /> <br />APPROACHES 3 <br /> <br />Flow Characterization (Task I) 3 <br />Criteria for Measuring Impacts (Task II) 5 <br />Preliminary Analysis of Alternatives (Task III) 7 <br />Preliminary Evaluation 'and Comparison of Impacts <br />(Task IV) 9 <br />Detailed Evaluation of Selected Alternatives <br />(Task V) 10 <br /> <br />STUDY SCHEDULE AND INFORMATION PRODUCTS 11 <br /> <br />Schedule 11 <br />Products 11 <br /> <br />BUDGET ALLOCATION 13 <br /> <br />PROJECT MANAGEMENT 13 <br /> <br />CREDITS 14 <br /> <br />FIGURE 1 - SOUTH PLATTE RIVER BASIN STUDY AREA <br /> <br />FIGURE 2 - SOUTH PLATTE RIVER BASIN ASSESSMENT STUDY SCHEDULE <br /> <br />FIGURE 3 - SOUTH PLATTE RIVER BASIN ASSESSMENT ORGANIZATION, <br />CHART <br /> <br />TABLE 1 - PROPOSED GAGING STATIONS FOR FLOW CHARACTERIZATION <br />OF THE SOUTH PLATTE RIVER SYSTEM <br /> <br />TABLE 2 - EVALUATION CRITERIA FOR WATER RESOURCES <br />DEVELOPMENT ALTERNATIVES <br /> <br />TABLE 3 - PRELIMINARY OUTLINE, SOUTH PLATTE RIVER BASIN <br />ASSESSMENT, INTERIM AND FINAL REPORTS <br /> <br />TABLE 4 - TASK BUDGET ALLOCATION <br /> <br />-i- <br />