Laserfiche WebLink
<br />in more detail than that applied to the preliminary analysis of <br /> <br /> <br />the pre-screened set of alternatives. The resultant <br /> <br /> <br />information from this detailed evaluation of the selected <br /> <br /> <br />alternatives will be summarized in a final study report <br /> <br /> <br />submitted to the Director of the Colorado Water Conservation <br /> <br /> <br />Board for formal comment and review. <br /> <br /> <br />STUDY SCHEDULE AND INFORMATION PRODUCTS <br /> <br /> <br />Schedule <br /> <br /> <br />The proposed scheduling of each task in the assessment <br /> <br /> <br />study is shown on Figure 2. Oral reports to the Director of <br /> <br /> <br />the Colorado Water Conservation Board have been scheduled at <br /> <br /> <br />two-week intervals. Seven written status reports, one <br /> <br /> <br />approximately every six weeks, have been scheduled. An interim <br /> <br /> <br />report is scheduled for completion on or about April 15, 1981, <br /> <br /> <br />and a final report on or about August 15, 1981. This study is <br /> <br /> <br />scheduled to be completed by September 30, 1981. <br /> <br /> <br />Public input will be extremely valuable in the execution <br /> <br /> <br />of this study. As stated in the scope of services, scheduling <br /> <br /> <br />as well as content of the public participation program remains <br /> <br /> <br />the responsibility of the Director of the Colorado Water <br /> <br /> <br />Conservation Board; hence, this has not been included <br /> <br /> <br />explicitly in the study schedule. <br /> <br /> <br />Products <br /> <br /> <br />A matrix evaluation for a water resources project is <br /> <br />incomplete without a detailed documentation of its purpose and <br /> <br />-11- <br />