My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03994
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP03994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:35:15 PM
Creation date
10/12/2006 12:04:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8059
Description
Section D General Studies-State Water Plan
State
CO
Date
1/1/1971
Author
MissBasInterAgeComm
Title
Missouri Basin Inter-Agency Committee Annual Programming Report-Fiscal Years 1971-1973
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The preconstruction planning for the Little Blue River channel in Missouri, <br /> <br />. <br />continued in fiscal year 1971 and will be completed in fiscal year 1972. <br /> <br />< <br /> <br />Land acquisition for the Little Blue Dams and Lakes, Kansas City, Missouri, <br /> <br />was initiated in fiscal year 1971. Acquisition will continue in fiscal years <br />1972 and 1973. Preconstruction planning continues. <br /> <br />Preconstruction planning for the Smithville local flood control project was <br /> <br />completed during fiscal year 1971. Construction is scheduled for fiscal <br /> <br />year 1972. <br /> <br />The Smithville Dam and Lake continued under preconstruct ion planning in <br /> <br />fiscal year 1971 and will continue in the planning phase during fiscal year <br />1972. <br /> <br />During fiscal year 1971, preconstruction planning continued on the Brookfield <br /> <br /> <br />Dam and Lake project. Planning will continue in fiscal years 1972 and 1973. <br /> <br />Land acquisition at the Pattonsburg Dam and Lake project for' the 1-35 High- <br /> <br /> <br />way crossing was initiated in fiscal year 1971. Construction of the highway <br /> <br /> <br />crossing is scheduled to start in fiscal year 1972 and continue in fiscal <br /> <br /> <br />year 1973. Preconstruction planning for the relocation of the town of <br /> <br /> <br />Pattonsburg will be started in fiscal year 1972 and will continue in fiscal <br /> <br /> <br />year 1973. <br /> <br />In fiscal year 1972 and continuing in fiscal year 1973, preconstruction plan- <br />ning will be carried on for the Mercer Dam and Lake. <br /> <br />3221 <br /> <br />Operation and Maintenance <br /> <br />As required by regulations, the Corps made the annual inspections of the local <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.