My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03985
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP03985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:06 PM
Creation date
10/12/2006 12:03:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
Little Snake River General
State
CO
Basin
Yampa/White
Water Division
6
Date
4/20/1990
Author
Western Water Consul
Title
Report on Modeling Approach and Project Configurations for Little Snake River Depletion Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />, . <br />ooo~~t <br /> <br />TABLE 3. SUMMARY OF WIRSOS INPUT FOR POT HOOK PROJECf <br /> <br />Pot Hook Reservoir Data <br /> <br />Storage right, priority date of 6-5-59 (73,580 AF) <br />Enlargement right, priority date of 4-19-66 (100,000 AF) <br />Minimum storage volume <br />Maximum storage volume <br />Maximum primary outlet capacity to Slater Creek <br />Initial storage volume at beginning of <br />study period (70% Total) <br /> <br />Area - Capacity relationship (as developed by USBR) <br /> <br />Instream Flow <br /> <br />Instream flow requirements in Slater Creek below dam <br /> <br />Irrigation Diversion Data <br /> <br />Pot Hook Canal (canal capacity = 290 cfs) <br />Diversion right, priority date of 6-5-69, (260 cfs) <br />Enlargement right, priority date of 4-19-66 (400 cfs) <br /> <br />Two Bar Canal: <br />Diversion right, priority date of 6-5-59 <br /> <br />Boone Lateral: <br />Diversion right, priority date of 6-5-69 <br /> <br />Deer Lodge Lateral: <br />Diversion right, priority date of 6-5-69 <br /> <br />Demand Schedule: <br />100% of appropriation for May through September <br /> <br />Irrigation Use Efficiencies and Return Flow Schedules: <br />Same as Water Development Baseline <br /> <br />24 <br /> <br />= <br /> <br />60,000 AF <br />OAF <br />34,000 AF <br />60,000 AF <br />1,000 cfs <br /> <br />= <br /> <br />= <br /> <br />= <br /> <br />42,000 AF <br /> <br />= <br /> <br />24 cfs <br /> <br />= <br /> <br />260 cfs <br />30 cfs <br /> <br />= <br /> <br />100 cfs <br /> <br />= <br /> <br />16 cfs <br /> <br />= <br /> <br />23 cfs <br />
The URL can be used to link to this page
Your browser does not support the video tag.