Laserfiche WebLink
<br />L; <br />~..:J1 <br />\..',1 <br />..-I <br /><') <br />(~ <br /> <br />- 7 - <br /> <br />RIO GRANDE CENTER PIVOT BUDGETS - 1977 <br /> <br />Budget #6 Center Pivot Corner Sgstem Feed Barley <br />150 Acres - Per Acre Cost and Returns <br /> <br />I. Gross Returns per acre <br /> <br />120 x 1.60 = <br /> <br />II. Variable costs per acre <br /> <br />Same as center pivot sgstem <br /> <br />170.94 <br /> <br />Income above variable cost <br /> <br />III. Machinery and equipment ownership <br /> <br />Same as Malt Barley corner system 58.81 <br /> <br />IV. <br /> <br />Returns to land, risk, management and <br />general farm overhead per acre <br />in the 150 acre area <br /> <br />+ 192.00 <br /> <br />21.06 <br /> <br />-37.75. <br />