Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />lOSS <br /> <br />Average Rate and Repayment Study, January 1962; and Report on Financial <br /> <br />Position MRBP, December 1963. The 1963 report was the basis for <br /> <br />establishment of the present Eastern Division MRB-F5 rate schedule. <br /> <br />The Eastern Division has marketed P-S MBP firm power under three basic <br /> <br />rate schedules since the adoption of the MRB-Fl rate schedule as of <br /> <br />April I, 1950. This schedule was superseded by the MRB-F4 rate schedule <br /> <br />on April I, 1954. There was no change in the basic rate. The area of <br /> <br />availability was expanded to include central and eastern Montana, and <br /> <br />the minimum charge was changed from a monthly minimum to a minimum <br /> <br />annual capacity charge. As a result of the 1962 Average Rate and <br /> <br />Repayment Study and the 1963 financial report (noted in the previous <br /> <br />paragraph), the MRB-F5 rate schedule was adopted effective with the <br /> <br />September 1965 billing period after consultation with Eastern Division <br /> <br />power customers. These rate schedules are summarized below. <br /> <br /> Monthly Energy <br />Schedule Effective Date Superseded by Capacity Charlie Charp;e <br /> ($/kw) (mills/kwh) <br />MRB-Fl 4-1-50 MRB-F4 0.75 3.5 for first <br /> 250 kwh/kw <br /> 3.0 for all other <br />MRB-F4 4-1-54 MRB-F5 0.75 Same as Fl <br />MRB-F5 9-65 1.00 3.00 <br /> <br />Essentially the same charge for firm power was made from 1949 until <br /> <br />1965 (16 years). Then the rate was increased about 5 percent and <br /> <br />has been in effect for over 7 years. All Eastern Division firm <br /> <br />power is now sold under the MRB-F5 rate schedule. <br /> <br />6 <br />