My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03901
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:45 PM
Creation date
10/12/2006 12:02:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
11/1/1962
Author
BOR, DoI
Title
Reconnaissance Report, cache La Poudre Unit, Colorado Peak Division, Missouri
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />Total annual O&M for all features wouJ.d be ......... .$531,100 <br />Total annual Replacement for e.ll features wouJ.d be .. 124,500 <br /> <br />Total Federal OM&R ................. $655,600 <br /> <br />An annual OM&R cost of $12,000 has been estimated for recreation <br />facilities. Since it is planned that the Bureau of RecJ.e.me.tion will <br />not administer these facilities, this cost is not inclUded in the above <br />OM&R figure. However, the annual OM&R has been considered in the <br />e.llocation of costs and economic analysis. <br /> <br />First St~e Development <br /> <br />Idylwilde Dam and Reservoir, with provision for future powerplant, <br />couJ.d be constructed as a first stage development. The feature 'WouJ.d <br />be the same size as proposed in the plan of development. It wouJ.d be <br />constructed during the first 3 years of the construction period, and <br />used initially for functions other than power in much the same way as <br />proposed for the total development. <br /> <br />Table A_l.__Estima.ted cost of proposed project by features <br /> <br />. <br /> <br />Feature <br /> <br />Oost <br /> <br />Total <br /> <br />$ 17,580,000 !! <br />1,269,000 <br />3,ll5,000 ....1 <br />31,856,000 :2t <br />455,000 <br />9,933,000 <br />.5,707,000 <br />4,369,000 ^I <br />27,447,000 ~ <br />3,140,000 <br />5.956,000 <br />81,000 <br />200,000 <br /> <br />$lll, 108, 000 <br /> <br />Idylwilde Dam and Reservoir <br />Kinnikinick Afterbay and Dam <br />Cache la Poudre Forebay and Dam <br />Grey Mountain Dam and Reservoir <br />Rustic Diversion Dam <br />Elkhorn Conduit <br />Cache la Poudre POlfer Conduit <br />Idy1wilde Powerplant <br />Oache la Poudre Powerplant <br />Transmission Lines <br />Switchyards and Substations <br />Conununications Equipment <br />Recreational Facilities <br /> <br />!! Includes costs for replacement or purchase of fish <br />rearing facilities <br />Pi. Includes costs for fish-wildlife mitigation <br />'if Includes costs for fish-wildlife mitigation <br /> <br />. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.