<br /> <br />8 <br /> <br /> <br />.\ <br /> <br />Grey Mountain !lam and Reservoir <br /> <br />The active capacity of Grey Mountain Reservoir woUld be <br />200,000 acre-feet and its inactive capacity 20,000 acre-feet. <br />The.maximum water surface elevation would be 5,626 feet, and <br />the top of the dead storage wOUld be elevation 5,424 feet. The <br />surface area of the dead storage poo~ would be 380 acres. The <br />surface area when the reservoir is full would be 1,800 a.cres. <br /> <br />The dam. would be an earth and rock-fill structure with the <br />upstream face riprapped. Its height above stream bed would be <br />about 375 feet, and the crest length would be 1,550 feet. A <br />concrete-lined chute spillway with a capacity of 90,000 cfs, a <br />gated inlet, and a stilling basin would originate in a sadd1.e <br />just left of the left abutment. The outlet works would consist <br />of a. tunnel, gate chamber, gates, steel pipe and vaJ.ve house and <br />would have a. oapacity of 4,000 cfs. The tunnel, which is <br />through the left abutment, would also serve as a diversion tunnel. <br /> <br />. <br /> <br />Irrigation releases to the North Poudre Supply Canal would <br />be made by modifying ~el No.2, an existing structure leading <br />eastwa.rd to the plains from the reservoir area. The municipal <br />waterworks of Fort Collins at an estimated cost of $1,755,000 <br />would be relocated along the south side of the river below the <br />dam. Existing telephone and REA power lines would be relocated <br />near the state Highway No. 14 relocation, south of the <br />reservoir. <br /> <br />Transmission Lines and Substations <br /> <br />The Cache la Poudre Powerplant is to be the center of power <br />operations. A power line leading to the Cache la Poudre switchyard <br />from Idy1.wilde switchyard would, therefore, be required. This <br />115 K.V Idylwilde line would be 22 miles in length. Five ll5 KV <br />Jines each 13 miles in length would be required from the Cache la <br />Poudre Powerplant Switchyard to a substation near Fort Collins, <br />Colorado. From this substation two ll5 KV 1.ines, each having a <br />length of 31 miles, would be required to tie into the existing <br />substation at the edge of Greeley, Colorado. Some additions <br />would be required at the Fort Collins Substation. <br /> <br />Communication Equipment <br /> <br />Idylwilde Powerplant would be operated by remote control <br />from the Cache la POudre Powerplant. Oarrier current equipment <br />at both powerplants and a telsmetering circuit wou1.d be used to <br />start, synchronize and control the generators at Idylwilde <br />Powerplant. <br /> <br />. <br />