My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03872
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03872
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:34 PM
Creation date
10/12/2006 12:01:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8410.350
Description
Platte River Basin - Basin Multistate Organizations - Missouri Basin IAC
State
CO
Basin
South Platte
Water Division
1
Date
12/3/1963
Author
Corps of Engineers
Title
MBIAC Subcommittee on Comprehensive Basin Planning - Outline of Work
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) / <br />. /- ~ "i <br /> <br />. <br /> <br />J- <br />. <br /> <br />002728 <br /> <br />u. S. ARMY ENGINEER DIVISION, MISSOURI RIVER <br />CORPS OF ENGINEERS <br />P. O. B"x 1216 <br />Omaha, Nebraska 68101 <br /> <br />3 December 1963 <br /> <br />MEMORANDUM TO: <br /> <br />Missouri Basin Inter-Agency Committee Members <br /> <br />FROM: <br /> <br />Chairman, Subcommittee on C mprehensive Basin Planning, <br />MBIAC <br /> <br />SUBJECT: <br /> <br />Outline for Comprehensive Framework Study - Missouri Basin <br /> <br />1. A copy of the Outline for the Comprehensive Framework Study of the <br />Missouri Basin is attached. This Outline was reviewed by the Subcommittee <br />on Comprehensive Basin Planning at its meeting on November 21st. The <br />Chapters of the Outline had been prepared by Work Groups selected to work <br />on a portion of the definition of scope. <br /> <br />2. The Outline will be presented to the Main Committee at the Meeting <br />in Lincoln, Nebraska, on December 10th as partial response to the assign- <br />ment given the Subcommittee at the meeting in June. The other two parts <br />of the Subcommittee assignment, preparation of estimates of cost and time <br />schedules f0r the study are being worked on. It is expected that they will <br />be ready for the Cmmittee meeting on January 29th and 30th, 1964. It is <br />anticipated that there will be discussion of this outline at the December 10th <br />meeting, although final action may not be taken until the cost estimates and <br />time schedules are available. <br /> <br />Incl: (in dupe) <br />Memo frm Chairman to Subcommittee <br />w/outline <br /> <br />Cho~ ~d?.A <br /> <br />CHARLES A. COCKS <br />Chairman, Subcommittee on <br />Comprehensive Basin Planning, <br />MBIAC <br />Governor John A. Love, thru Stanley Miller <br />Governor Harold Hughes, thru H. G. Hershey <br />Governor John Anderson, thru John Dewey <br />Governor Karl Rolvaag, thru G. Chapman <br />Governor John Dalton, thru C. L Summers <br />Governor Tim Babcock, thru Wilbur White <br />Governor F. B. Morrison, thru Dan S. Jones <br />Governc.r W. L. Guy, thru Milo Hoisveen <br />Governor Archie Gubbrud, thru J. W. Grimes <br />Governor C. P. Hansen, thru G. Christopulos <br /> <br />Brig.. Gen. Geo H. Walker <br />C. Dale Jaedicke <br />Verne Alexander <br />Herbert C. Clare <br />Harrell F. Mosbaugh <br />Arnie Solem <br />Kenneth G. Tower <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.