Laserfiche WebLink
<br />II. HYDRO-SALINITY MONITORING & EVALUATION <br /> <br />A. 81lJDmRY OJ' BYDRo-SALDTJ:TY IlOlfITORIlfG , BVALUATIOJI: <br /> <br />Durinq the 1991 irriqation season, usable data was <br />collected from four monitorinq sites and two ET stations. A <br />fifth site was selected but the monitorinq equipment for <br />that site did not arrive in time to set up before the <br />irriqation season started. <br /> <br />At the present time, the software beinq used by the <br />Grand Junction M&E Team is not capable of reducinq the data <br />that was collected by the McElmo Creek M&E Team. The <br />software will be modified as soon as an official M&E <br />software support person is desiqnated. This M&E software <br />support person will coordinate any software modifications <br />with the three M&E Teams in Colorado as all three M&E Teams <br />use the same software proqrams for data reduction. As soon <br />as the modifications are made, the data collected durinq the <br />1991 irriqation season will be reduced for the next McElmo <br />Creek Unit Annual Report. <br /> <br />1. The rainfall amount that fell durinq the 1991 <br />irriqation season (May 1 throuqh September 30) was 3.3 <br />inches. The ET rate for the same period was 29.80 inches <br />(Jensen-Raise formula) and was taken from the Extension <br />service's weather station. <br /> <br />2. The primary crop that was monitored on all sites <br />was alfalfa or an alfalfa-qrass mixture with a predominance <br />of alfalfa. <br /> <br />3. Selection of sites with no improvements installed <br />is very difficult. The fields are irregularly shaped, <br />fields are corruqated, slopes are not uniform, water may be <br />delivered to a field by one or more delivery ditches, <br />tailwater may leave the field at several different points, <br />and water may flow across the field in several different <br />directions. <br /> <br />Site #10 - 19.0 acre established alfalfa field. Water <br />is delivered by earthen ditch into earthen feeder ditches <br />and then into corruqates. The field was irriqated three <br />times throuqhout the season with each irriqation lastinq 20- <br />22 days. <br /> <br />site #11 - 10.0 acre newly established alfalfa field. <br />Water is delivered by earthen ditch into flex tube with <br />control qates. This field was used as a demonstration field <br />for surqe irriqation. A lack of manaqement and <br />. .., <br />understandinq on the farmer's part prevented this '\~ <J~"" <br />demonstration from beinq a complete success. The fiel~~as <br />irriqated 8 times durinq the irriqation season. <br />