Laserfiche WebLink
<br />Item <br />Recreation/Dead Pool <br />Sedimentation <br />Rangely <br />Other Water Sales <br /> <br />Year <br />1990 <br />2100 AF <br />1746 AF <br />1735 AF <br />4019 AF <br /> <br />Year <br />2014 <br /> <br />815 AF <br /> <br />7050 AF <br />1735 AF <br />-0- <br /> <br />2.4.4 Hydroelectric Generation Potential <br /> <br />2.4.4.1 A 2000 kw (7200 MJ) power plant under the conditions dIctated <br />by Alternative C would generate an estimated 10 million kwh per year <br />(36 million MJ) at a cost per kwh of 24 mills. <br /> <br />2.4.5 Access Roads <br /> <br />2.4.5,1 The access roads required for Alternative C would be the same <br />as for Alternative A except 3400 lineal feet (1036 m) of Colorado <br />Highway 64 would have to be relocated Instead of 3500 lineal feet <br />(1067 m). <br /> <br />2.4.6 Applicants Proposed Mitigation Measures <br /> <br />2.4.6,1 Revegetat Ion - The app 11 cant proposes to revegetate all <br />borrow areas above the high water line after construction, <br /> <br />2.4.6,2 Fishery Facilities - The outlet works concept Is the same as <br />Alternative A and the fish should have no problem escaping the water <br />moving through the trashracks. <br /> <br />2.4,6.3 Additional Mitigation Measures - Mitigation measures are <br />discussed In detail In Chapter 5. <br /> <br />2.4,7 Comparative Cost <br /> <br />2.4.7.1 The estimated annual cost per acre-foot In 1980 dollars less <br />engineering and construction management for Alternative C would be <br /> <br />24 <br />