Laserfiche WebLink
<br />.> <br /> <br />useful life and requires replacement at a cost far above its original <br />cost. Figure E-8 shows, for the years 1960 through 1974, the U.S. cost <br />indexes for labor and for construction machinery and equipment, taken <br />from the Engineering News Record and the United States Department of <br />Labor. The graph also shows the cost indexes for CRSP wageboard salaries <br />for the same period. It is noted that the average annual increases are <br />7.2 percent for United States labor costs, 5.25 percent for CRSP wage- <br />board salaries and 4.5 percent for United States construction machinery <br />and equipment costs. <br /> <br />" <br /> <br />Following is a summary of CRSP past O&M costs in millions of dollars for <br />the period fiscal year 1970 through 1974 and estimates for the fiscal <br />years 1975, 1976, 1977, and 2001, after which the cost remains constant. <br />The costs for other intervening years are shown in Table F-l. <br /> <br />1970 1971 1972 1973 1974 1975* <br /> <br />1976* <br /> <br />1977* <br /> <br />2001* <br /> <br />5.283 5.804 5.962 6.285 6.939 8.309 <br /> <br />8.264 <br /> <br />9.404 <br /> <br />9.470 <br /> <br />*Estimated <br /> <br />Estimates of future O&M costs are based on actual historical costs <br />experienced by the project and experience from all other Bureau proj- <br />ects. The annual O&M costs estimate for the 3 immediate future years <br />(FY 1975, 1976, and 1977) is reconciled to the most current official <br />program budget documents. The third-year estimate is continued for each <br />of the remaining years of the study except that additional O&M expenses <br />are projected for approved additions in the expected operational year <br />and thereafter, and subtractions are projected for years after 1977 for <br />the extraordinary expenses in that year. Extensive spillway tunnel <br />repair at Flaming Gorge and bridge road repair at Glen Canyon are <br />planned for that year. Taking that into account and phasing out Recla- <br />mation's cost of operating the city of Page offsets future increases due <br />to planned powerplant and transmission additions, so that the O&M <br />expenses for fiscal year 2001 are almost equal to those for fiscal year <br />1977 . <br /> <br />b. Firming purchases. As explained in sub-paragraph E(4)(a), <br />firming purchases have been made in the past and are planned for the <br />future in order to meet the commitments contained in existing contracts, <br />most of which expire in 1986. After that time, no firming purchases are <br />projected. Following is a tabulation showing the amount of firming pur- <br />chases and the price per kWh for the fiscal year 1970-75 period: <br /> <br /> 1970 1971 1972 1973 1974 1975* <br />Million Dollars 0.475 1. 0 32 0.918 1.835 7.575 4.240 <br />Million kWh 150 436 391 419 1,568 652 <br />Mills/kWh 3.17 2.37 2.35 4.38 4.83 6.50 <br />*Estimated <br /> <br />33 <br />