Laserfiche WebLink
<br />"'..;'.": <br /> <br />'. <br /> <br />.,..-';" <br /> <br />.- -",',.' <br />';~~~ <br />:, . <br /> <br />002252 <br /> <br />He also suggested the possibility of a future power interconnection with <br />the large main stem Gunnison River development being studied by the Grand <br />Junction office. <br /> <br />.'..;....:..' <br /> <br />,.,-:.:,<':.. <br />~".:":..":.<:' <br /> <br />Plans for Blue-South Platte Project <br /> <br />32, Mr. Knights stated that it is his plan to submit a single report <br />for this project on June 1948. The status report will be combined with and <br />made part of the interim report. The overall project development possibilities <br />will be discussed as the basis of selecting the capacity of the Montezuma <br />tunnel through the Continental Divide. The report will describe an initial <br />project for authorization and construction. The magnitude of. the suggested <br />initial project has not.been definitely determined. Economic studies of <br />power developments along the South Platte River must be completed before <br />decision can be made on the desirability of including some of these features <br />in the initial project. It is planned that the initial project features <br />will permit the annual diversion of between 150,000 acre-feet and 190,000 <br />acre-feet from the Blue River watershed to the South Platte basin. The fea- <br />tures tentatively selected for initial project development and their estimated <br />construction costs as of July 1946 (to show cost as of July 1947 apply factor <br />of 1,15) are shown in the following table: (Note: Costs and features .are <br />tentative and subject to change as investigations progress). <br /> <br />...../ <br /> <br />. '.~ <br /> <br />..: <br /> <br />> <br /> <br />E~:.<:;'~~ : <br />::::~ttf; <br /> <br />.... <br /> <br />Feature <br /> <br />Estimated Cost <br />(July 1946) <br /> <br />. : ':.('. <br /> <br />. . .~.:.., <br /> <br />.... '..~':" <br /> <br />Ten Mile Reservoir <br /> <br />$13 ,000,000 <br /> <br />....... <br /> <br />Blue. Reservoir Supply Canal <br /> <br />. <br /> <br />400,000 <br />3,400,000 <br />4,100,000 <br /> <br />.'~ '.:' <br />." :', <br /> <br />Ten Mile Diversion Canal <br /> <br />':'.,_";:-f' <br />,.'.'. <br /> <br />Blue Reservoir <br /> <br />.';. ";". <br />'.....:... <br />-: ~,;':. <br /> <br />.' -.' f~ ,.' <br /> <br />...,;. . <br />". <br /> <br />Blue-Snake Tunnel <br /> <br />4,300,000 <br />500,000 <br />27,600,000 <br /> <br />"," <br />'..' .~. <br /> <br />Snake River Canals (Temporary) <br /> <br />Montezuma Tunnel <br /> <br />..........:. <br /> <br />Power Conduit to Grant <br /> <br />1,200,000 <br />1,200,000 <br />2,200,000 <br />1,600,000 <br /> <br />";;",.:.;::. <br />}..).:.,~,:..: <br />::.;;~':/'~ , <br />....:., <br /> <br />.' <br />'." <br /> <br />Grant Power Plant <br /> <br />Conduit Grant to Singleton <br /> <br />Singleton Power Plant <br /> <br />Shawhee Reservoir <br /> <br />Shawhee Power Plant <br /> <br />9,500,000 <br />1,300.000 <br /> <br />Subtotal <br /> <br />$70,300,000 <br /> <br />....1 <br /> <br />9 <br /> <br />.. .' <br /> <br />"'-"---..' <br /> <br />'. . :~'''.:' <br />..':... <br />.;.. <br /> <br />:"'. <br /> <br />:..... <br />