<br />He also suggested the possibility of a future power interconnection with
<br />the large main stem Gunnison River development being studied by the Grand
<br />Junction office.
<br />
<br />.'..;....:..'
<br />
<br />,.,-:.:,<':..
<br />~".:":..":.<:'
<br />
<br />Plans for Blue-South Platte Project
<br />
<br />32, Mr. Knights stated that it is his plan to submit a single report
<br />for this project on June 1948. The status report will be combined with and
<br />made part of the interim report. The overall project development possibilities
<br />will be discussed as the basis of selecting the capacity of the Montezuma
<br />tunnel through the Continental Divide. The report will describe an initial
<br />project for authorization and construction. The magnitude of. the suggested
<br />initial project has not.been definitely determined. Economic studies of
<br />power developments along the South Platte River must be completed before
<br />decision can be made on the desirability of including some of these features
<br />in the initial project. It is planned that the initial project features
<br />will permit the annual diversion of between 150,000 acre-feet and 190,000
<br />acre-feet from the Blue River watershed to the South Platte basin. The fea-
<br />tures tentatively selected for initial project development and their estimated
<br />construction costs as of July 1946 (to show cost as of July 1947 apply factor
<br />of 1,15) are shown in the following table: (Note: Costs and features .are
<br />tentative and subject to change as investigations progress).
<br />
<br />...../
<br />
<br />. '.~
<br />
<br />..:
<br />
<br />>
<br />
<br />E~:.<:;'~~ :
<br />::::~ttf;
<br />
<br />....
<br />
<br />Feature
<br />
<br />Estimated Cost
<br />(July 1946)
<br />
<br />. : ':.('.
<br />
<br />. . .~.:..,
<br />
<br />.... '..~':"
<br />
<br />Ten Mile Reservoir
<br />
<br />$13 ,000,000
<br />
<br />.......
<br />
<br />Blue. Reservoir Supply Canal
<br />
<br />.
<br />
<br />400,000
<br />3,400,000
<br />4,100,000
<br />
<br />.'~ '.:'
<br />." :',
<br />
<br />Ten Mile Diversion Canal
<br />
<br />':'.,_";:-f'
<br />,.'.'.
<br />
<br />Blue Reservoir
<br />
<br />.';. ";".
<br />'.....:...
<br />-: ~,;':.
<br />
<br />.' -.' f~ ,.'
<br />
<br />...,;. .
<br />".
<br />
<br />Blue-Snake Tunnel
<br />
<br />4,300,000
<br />500,000
<br />27,600,000
<br />
<br />","
<br />'..' .~.
<br />
<br />Snake River Canals (Temporary)
<br />
<br />Montezuma Tunnel
<br />
<br />..........:.
<br />
<br />Power Conduit to Grant
<br />
<br />1,200,000
<br />1,200,000
<br />2,200,000
<br />1,600,000
<br />
<br />";;",.:.;::.
<br />}..).:.,~,:..:
<br />::.;;~':/'~ ,
<br />....:.,
<br />
<br />.'
<br />'."
<br />
<br />Grant Power Plant
<br />
<br />Conduit Grant to Singleton
<br />
<br />Singleton Power Plant
<br />
<br />Shawhee Reservoir
<br />
<br />Shawhee Power Plant
<br />
<br />9,500,000
<br />1,300.000
<br />
<br />Subtotal
<br />
<br />$70,300,000
<br />
<br />....1
<br />
<br />9
<br />
<br />.. .'
<br />
<br />"'-"---..'
<br />
<br />'. . :~'''.:'
<br />..':...
<br />.;..
<br />
<br />:"'.
<br />
<br />:.....
<br />
|