<br />r
<br />
<br />studying part of the laterals in the Basin and will later supplement
<br />this report with their findings.
<br />
<br />The Agricultural Stabilization and Conservation Service (ASCS)
<br />allotted two million dollars of FY 1980 Agricultural Conservation
<br />Program funds to accelerate application of salinity control measures
<br />in the Uintah Basin. ASCS has selected several target areas in which
<br />to concentrate these funds. A monitoring program is being developed
<br />to measure impacts of the program on water conservation and water
<br />qua 1 i ty.
<br />
<br />The word "project", a s used throughout the report, is meant to be the
<br />sal i ni ty control program. For exampl e, "future wi thout a proj ect"
<br />means future conditions without the salinity control program.
<br />
<br />All references to U.S. Bureau of Reclamation (USBR) throughout the
<br />report will be understood to mean Water and Power Resources Service
<br />(WPRS).
<br />
<br />The narrative of the report is not being revised to incorporate these
<br />items except for the Summary (pages 1 and 2), page 4, and page 44.
<br />Pertinent tables are replaced to revise the necessary data.
<br />
<br />Remove and replace the following pages with the attached revised pages
<br />dated November, 1980:
<br />
<br />1, 2, 3, 4, 36, 31, 38, 42, 43, 44, G-5, G-8, G-11, G-14, G-17,
<br />G-20, G-23, G-26, G-29.
<br />
<br />Make the following pen and ink corrections:
<br />
<br />Page 11, last paragraph, third line - virtually is misspelled
<br />
<br />Page 30, fourth paragraph, fifth line - Change 3.4 to 2.8
<br />
<br />Page 30, last paragraph, fifth line - Change 11.7 to 9.8
<br />
<br />Page 31, second paragraph, fifth line - Change 15.0 to 12.5
<br />
<br />Page 31, fourth paragraph, fifth line - Change 86 to 75
<br />
<br />Page 33, last paragraph, third line - Change 12.4 to 10.3
<br />
<br />Page 40, paragraph C.2, third line - Change 550 to 3850
<br />
<br />Page 40, paragraph C.3, second tine - Change 3850 to 550
<br />
<br />Page 40, paragraph E. 1. - Change 22.6 MWh to 22,600 MWh
<br />Page F-1, third paragraph - Change $343,000 to $365,000
<br />
<br />.. j " I! 1',1,
<br />.. . '_ J: 'J L
<br />
<br />-I
<br />j
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />~
<br />I
<br />I
<br />I
<br />
|