<br />CONSTRUCTION ACTIVITIES <br /> <br />The contractor essentIally completed all the <br />concrete placement In Crystal Dam. Curecanf. <br />Unit. Colorado on August 30. 1976. and the <br />diverSion tunnel plug placement was completed <br />on Apnl 12, 1977 The reservOir '11I1ng began <br />MarCh 14. 1977 Work, on the electncal comple- <br />lion contract was started In September 1977 A <br />clearing contract for Crystal Reservoir was <br />awarded In July 1977. With work starting In <br />September Twenty-nine percent of the <br />clearing work was campleled by the end 01 the <br />Itscal year, <br />A contract was awarded In December 1976 lor <br />rock removal above the Blue Mesa Powerplant <br />01 the Curecanll Umt. Work was started In <br />April 1977 and was about 87 percent complete <br />by the end 01 fiscal year 1977 <br />In the Transmission DIVISIon. the Hayden Sutr <br />station Stage 02 was completed m November <br />1976 and the Rille SubstatIon In August 1977 <br />On the Glen Canyon Unll. work continued on <br />curbs. gullers. and sldewalk.s lor Page. Ariz <br />With all work completed on September 2, 1977 <br />The bridge deck replacement lor the Glen <br />Canyon bridge was continued. wllh all work. <br /> <br />S<>iIltnq Y'OO~('S In I<nlog or Gr.l~'ty Miltn Cilnal-N,J~dIO <br />lo<J'olrl l"'q.JI,OO Proloct <br /> <br /> <br />,:; <br /> <br />. . <br />J ..,.-r <br />~ . <br />'--....I:!I <br /> <br />completed In January 1977, Work on the Carl <br />Hayden VIsitor Center was contmued IOta the <br />Ilsca! year and completed In May 1977. <br />For the Lyman ProJecl. Utah~Wyomlng. a <br />contract was awarded lor Stafeline Dam In <br />November 1976. In May 1977, excavation 01 <br />the culoff french and outlet works was started <br />and conllnued through the ',scal year for <br />about 60 percent completIon. First concrete <br />placement was made In the stilling baSin In <br />September 1977 <br />DUring the year. three contracts were awarded <br />for the Jensen UOI! of the Central Utah <br />Pro/eCI In Utah One lor road relocation was <br />awarded on September 30. 1976, With work <br />starting In November 1976. and was 98 percent <br /> <br />Construction Costs ~ Annual and Accumulated <br /> <br />complete by Ihe end 01 fiscal year 1977, Another <br />for the Tyzilck Field Slatlon was awarded In <br />December 1976 and completed In Sepfember <br />1977. A contract for Red Fleet Dam (formerly <br />Tyzack Dam) was awarded In April 1977 <br />Excavation started for the oullet works and <br />lunnel portals In July 1977. By the end 01 the <br />fiscal year, work on the dam was about 16 <br />percent complete <br />On Bonneville Unl!. Cenlral Utah PrOJect. lhe <br />contractor conllnued construction of Currant <br />Creek Dam. completing all earthwork In July <br />1977. The dam was 99 percent complete by <br />the end 01 ',scal year 1977 ConstructIon was <br />Inllrated on Vat Tunnel on October 4, 1976. <br />and continued throughout the fIscal year wllh <br /> <br />Fiscal year 1968 <br />To date as of 6/30/68 <br />F,scal year 1969 <br />To date as of 6/30/69 <br />Fiscal year 1970 <br />To dale as 01 6/30/70 <br />FIscal year 1971 <br />To dale as of 6/30171 <br />Fiscal year 1972 <br />To dale as of 6/30172 <br />F,scal year 1973 <br />To date as of 6/30173 <br />Fiscal year 1974 <br />To date as of 6/30/74 <br />FIscal year 1975 <br />To date as of 6/30/75 <br />Fiscal year 1976 <br />To date as 01 6/30176 <br />TranSlllonal quarter and <br />fIscal year 1977 <br />To dale as of 9/30/77 <br /> <br />Annual Accumlllat~ <br />$51.785.180 <br /> $771.955.084 <br />44,128.461 <br /> 816.083.545 <br />38.517,800 <br /> 854,601.345 <br />30,443.914 <br /> 885,045.259 <br />43.187.756 <br /> 928.233,015 <br />46.588.918 <br /> 974.821.933 <br />36.986.459 <br /> 1.011.808.392 <br />52,303.718 <br /> 1,064.112.110 <br />70.281,741 <br /> 1.134,393.851 <br />131,750.705 <br /> 1.266.144,556 <br /> <br />4 <br />