My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03573
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:06 PM
Creation date
10/11/2006 11:49:56 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1977
Author
USDOI
Title
21st Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The towns 01 Lyman and Mountam View. <br />Wyommg signed repayment contracts on <br />January 6. 1977. provldmg for repayment of <br />constructton costs 01 StateJine Dam allocated <br />to munIcipal and mdustrial water <br />An award to install selective withdrawal <br />structures on Flammg Gorge Dam in Utah to <br />attam temperature control was made March 22. <br />1977, and lor the Visitor Center addition <br />September 30, 1977, <br />Awards were made lor Block 3 drams, Emery <br />County Project. September 14, 1977, and for <br />rock removal, Blue Mesa, Curecanli Unit, <br />December 9, 1976. <br />DUflng the year, construction lunds of $3 <br />million were rescinded on the FrUItland Mesa <br />Project In Colorado and Savery-Pot Hook Project <br />In Colorado-Wyommg ThiS termmated all <br />work on the prOjects except for completion 01 <br />ongomg studies, <br />Water stored 10 completed reservOIrs 01 the <br />Storage Project Significantly reduced adverse <br />effects of the 1977 drought. Water was <br />released tor irrigation, for municipal and <br />industrial uses, lor hydroelectric power <br />production, and for other purposes presented <br />later in this report <br />Plans were made lor the power marketing <br />functions, Includmg the construction and <br />operation and maintenance of transmission <br />tines and attendant facilities, to be transferred <br />to the Department of Energy on OctOber 1, <br />1977. <br />Revenues contInued to be accumulated and <br />lorwarded to the Federal Treasury with <br />$20,854.212 being received lor the 15-month <br />peflod ending September 30. 1977 Of this <br />amount, interest payments totaled $13,590.442: <br />the $7,263.770 balance was applied as <br />payment on investment. Most 01 the revenues <br />were derived from power sales with the gross <br />generation being 64 billion kilowatt-hours. <br /> <br /> <br /> <br />i(i;~--J.-.J:'". <br />L ''I.- <br /> <br />.7""._~. <br /> <br />, <br /> <br />'. <br /> <br />",...:- <br />. <br /> <br />.... <br />. ..'~ <br />~;.;..;., <br /> <br /> I ~ <br />'. /' <br />. <br /><'" <br />.,~ ,II <br /> " '" <br /> <br /> <br />.~ <br /> <br />/' ~-"- <br />~'. ~: . . ,~~ <br />.i-~'. .!l: '\f; " <br />.- ~ . ~ <br /> <br />--... .'- .~~- <br />"-.o....JWo;.:',,-,-.' :-,:.:&. ':..... <br />.,..~.' . ""~~'~ <br />. j2~~ :.,1~ <br />.m... '\: ,\'*S.~\'~ <br /> <br />.. <br /> <br /> <br />In Ie! porlal to tunnel 5. Gravity MaIn Canal-NavalO lnd,,,,n l"'gallOn PrOlfJCl <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.