My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03479
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:37 PM
Creation date
10/11/2006 11:45:40 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.03
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
8/10/1990
Title
CWCB Agenda Item #8, September 10-11-1990-Board Meeting - Glen Canyon Dam Legislation (H.R. 4498 and S. 2807)
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4 conclusions, and recommendations made in the studies and <br />5 the statement prepared pursuant to subsection (a)(1) and the <br />6 audit performed pursuant to subsection (a)(2), the Secretary <br />7 shall implement power operating criteria for Glen Canyon <br />8 Dam that will ensure that Glen Canyon Dam is operated in a <br />9 manner consistent with this Act. <br /> <br />",t'::":"", <br />(~.~\1 <br /> <br />~ <br />~; <br />" <br />~,' <br />;.: <br /> <br />--",", <br />:'".\..1 <br /> <br />9 <br /> <br />1 criteria identified pursuant to section (a)(1) and report the <br />2 results of the audit to the Secretary and the Congress. <br />3 (b) OPERATING CRITERIA.-(1) Based on the findings, <br /> <br />,,> <br />".. <br /> <br />/~ <br />';~ <br /> <br />.1 <br /> <br />,0 <br /> <br />;.-';;' <br />.; -':~ <br /> <br />tfi <br />:~y <br />~{ <br />~1~ <br /> <br />10 (c) REPORT.-Upon adoption of permanent power oper- <br />11 ating criteria under subsection (b), the Secretary shall submit <br />12 to the Congress- <br /> <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br /> <br />,; ~., <br /> <br />(1) the environmental impact statement described <br /> <br />in subsection (a); and <br /> <br /> <br />(2) a report describing the power operating crite- <br /> <br />ria and other measures taken to protect, mitigate ad- <br /> <br />verse impacts to, and improve the condition of the en- <br /> <br />vironmental and recreational resources of the Colorado <br /> <br />~..' <br /> <br />;~., <br /> <br />t;:;' <br />"'.' <br /> <br />~ <br /> <br />';1;', <br />~~' <br />, ...~ <br />~-~-~ <br />;"";(r, <br />:q., <br />5' <br />:~,,~ ' <br />':..;;j' <br /> <br />River downstream of Glen Canyon Dam. <br />(d) COSTS OF PREPARING ENVIRONMENTAL IMPACT <br /> <br />21 STATEMENT.-AIl direct costs of preparing the environmen- <br />22 tal impact statement described in subsection (a) shall be non- <br />23 reimbursable. <br /> <br />-".,1 <br /> <br />.8 280. IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.