My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03479
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:37 PM
Creation date
10/11/2006 11:45:40 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.03
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
8/10/1990
Title
CWCB Agenda Item #8, September 10-11-1990-Board Meeting - Glen Canyon Dam Legislation (H.R. 4498 and S. 2807)
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,<'1i;:; <br />'V <br /> <br />- I <br />i <br />< <br /> <br />"' <br />t:; <br /> <br />5 <br /> <br />1 <br /> <br /> 1 ating criteria described in paragraph (1), the Secretary shall <br /> 2 implement such criteria not later than 30 days thereafter. <br /> 3 (3) If, pursuant to paragraph (1) the Secretary deter- <br /> 4 mines that the scientific data are not reasonably sufficient to <br /> 5 permit the implementation of the interim power operating cri- <br /> 6 teria described in paragraph (1), the Secretary shall- <br /> 7 (A) submit a report to Congress stating the nature <br /> 8 of the scientific data that are lacking so as to preclude <br /> 9 the immediate implementation of interim power operat- <br /> 10 ing criteria pursuant to paragraph (2); <br /> 11 (B) proceed as quickly as possible to procure such <br /> 12 data; and <br /> 13 (C) implement such criteria not later than 30 days <br /> 14 after adequate scientific data become available, and in <br />) 15 no event later than the earlier of- <br /> 16 (i) 30 days after the cessation of research <br /> 17 flows for the purpose of completing the environ- <br /> 18 mental impact statement; or <br /> 19 (ii) September 1, 1991. <br /> 20 (b) OBJECTlVEs.-The interim power operating criteria <br /> 21 described in subsection (a) shall be designed 00- <br /> 22 (1) not interfere with the water storage and deliv- <br /> 23 ery functions of Glen Canyon Dam pursuant to the <br /> 24 Colorado River Compact, the Upper Colorado River <br /> <br />," <br /> <br />'.\ <br /> <br />.. <br />t, <br />~ <br />!', <br /> <br />:'L I <br /> <br />~^. <br /> <br />'~ <br /> <br />r- <br /> <br />r:-, <br /> <br />l't, <br /> <br />~~ <br />~ <br /> <br />? <br />,-r.. <br /> <br />" <br /> <br />," <br /> <br />i~ ; <br />.~. <br /> <br />k~ <br /> <br />'-;, <br /> <br />;~ - <br />;,:'" <br />~," <br /> <br />;..'. <br /> <br />i,-' <br />t~; <br />'~'.~ <br />.~. <br />F~" <br />i(' <br />~ <br />~-~~- <br /> <br />:', <br /> <br />,;.: <br />",< <br />~:;1 <br />~..; <br />~,-; <br />/:. <br />:.;> <br />.l>: <br /> <br />.s 2807 IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.