My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03477
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:36 PM
Creation date
10/11/2006 11:45:21 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
1/1/1990
Author
Central Utah WCD
Title
Construction Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Upper Stillwater Dam <br />Contractor crews cOOlinued (0 grout and to inject rt.'sin in vcrtical <br />cracks on the upstream tace ll( the dam and in the gallery. Cleanup in <br />the I~m'er gallery COOlinues. Sc:n:ral brass surwying plates han: been set <br />on the top ot the dam. <br />Urpt"r Stillwatt'r Reservoir (illin\.: continued, reaching ;1 stage o( <br />about 8,138 feet c1t'\';lritm (22.0(,\(\ acre fel.t) t)t) May 31. 1989. Initial <br />di\"t'rsions from dw rL'Sl'n.oir to Strawlkrry Aqueduct were made May <br />24. IQR9, and will continuc as f1ow!oo excced the fillinJ.,: criteria. UprX'r <br />Stillwater is t'xpt'crc:d to fill in late June, 19S9. Turbidity in the reservoir <br />has declined from 23 units down to oS units and is wdl within Statt' <br />standards to permit diversion to thL' StrawhtOrry CoUt'nion Sptem. <br />~1inimum fisherr tlows hclow the ("t1ntluence of South Fork and Rock <br />Creek are b.:ing maintaineu ;J( 29 cubic fee! per sc:cond. <br /> <br />Strawberry Aqueduct and Collection System <br /> <br />General <br /> <br />A transfer inspt'ction of Rhodes and Win Inlets and Feeder Pipeline:; <br />was conducted June I and 2, 1989. The following features impt'cted last <br />year were revisited: Dll('s Inlet and Feeder Pipeline, Hade:; Inlet and <br />Feeder Pipeline, and Vat Diversion Dam and Feeder Pipeline. All of <br />the above features are ~heduled for transfer to the Central Utah <br />\Vater CllnServancy District (CU\VCD) on July 1, 1989. Representa. <br />th-es from CU\VCD and Reclamation's Denver, Reg-ional, Utah <br />Projects. and Bonneville Construction Offices panicipated in tht" <br /> <br />July. 1989 <br /> <br />inspection!'. <br /> <br />Munio:ipal and Industrial Spt(-'m August, 1989 <br />Jordanelle Dam, Stage 2 <br />The dam embankmt"nt area was excavated belwet:n ~(ations 19+00 <br />and 2 i +;0. Exca\'ating and drilling for the low.lewl outlet works <br />structure was started. The Provo Ri\.er diwrsion channel was cleared <br />and excavated from U.S. Highway 40 to the dam t:mbankment area, <br />and riprap was placed. Sheet pilings are being driven along a porti...")n of <br />the channel. \Vork on the U.S. Highway 40 detour road and bridge <br /> <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.