Laserfiche WebLink
<br />Upper Stillwater Dam <br />Contractor crews cOOlinued (0 grout and to inject rt.'sin in vcrtical <br />cracks on the upstream tace ll( the dam and in the gallery. Cleanup in <br />the I~m'er gallery COOlinues. Sc:n:ral brass surwying plates han: been set <br />on the top ot the dam. <br />Urpt"r Stillwatt'r Reservoir (illin\.: continued, reaching ;1 stage o( <br />about 8,138 feet c1t'\';lritm (22.0(,\(\ acre fel.t) t)t) May 31. 1989. Initial <br />di\"t'rsions from dw rL'Sl'n.oir to Strawlkrry Aqueduct were made May <br />24. IQR9, and will continuc as f1ow!oo excced the fillinJ.,: criteria. UprX'r <br />Stillwater is t'xpt'crc:d to fill in late June, 19S9. Turbidity in the reservoir <br />has declined from 23 units down to oS units and is wdl within Statt' <br />standards to permit diversion to thL' StrawhtOrry CoUt'nion Sptem. <br />~1inimum fisherr tlows hclow the ("t1ntluence of South Fork and Rock <br />Creek are b.:ing maintaineu ;J( 29 cubic fee! per sc:cond. <br /> <br />Strawberry Aqueduct and Collection System <br /> <br />General <br /> <br />A transfer inspt'ction of Rhodes and Win Inlets and Feeder Pipeline:; <br />was conducted June I and 2, 1989. The following features impt'cted last <br />year were revisited: Dll('s Inlet and Feeder Pipeline, Hade:; Inlet and <br />Feeder Pipeline, and Vat Diversion Dam and Feeder Pipeline. All of <br />the above features are ~heduled for transfer to the Central Utah <br />\Vater CllnServancy District (CU\VCD) on July 1, 1989. Representa. <br />th-es from CU\VCD and Reclamation's Denver, Reg-ional, Utah <br />Projects. and Bonneville Construction Offices panicipated in tht" <br /> <br />July. 1989 <br /> <br />inspection!'. <br /> <br />Munio:ipal and Industrial Spt(-'m August, 1989 <br />Jordanelle Dam, Stage 2 <br />The dam embankmt"nt area was excavated belwet:n ~(ations 19+00 <br />and 2 i +;0. Exca\'ating and drilling for the low.lewl outlet works <br />structure was started. The Provo Ri\.er diwrsion channel was cleared <br />and excavated from U.S. Highway 40 to the dam t:mbankment area, <br />and riprap was placed. Sheet pilings are being driven along a porti...")n of <br />the channel. \Vork on the U.S. Highway 40 detour road and bridge <br /> <br /> <br />20 <br />