Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />o <br />.... <br />" <br />c;o <br />N <br /> <br />OPEKATION sKlI~ <br /> <br />Big Thompson River water in excess of the minimum requirements, as <br />recommended by tile State of Colorado Division of Wildlife and the <br />Federal Fish and Wi lolife Service, is diverted at Lake Estes into <br />the Foothills System for power generation. This operation is known <br />as operat i on "sk im. " The amount diverted depends on the flow of the <br />Big Thompson River and tributaries above Lake Estes, importations <br />through Adams Tunne I, and the capacity of the F oothi 11 s sys tem. <br /> <br />Tne water taken from the Big Thompson River is used for power generation <br />immediately or is held in storage and replaced to the river by other <br />water in the system, depending on power requirements. In general, water <br />taken from the Big Thompson River at a variable rate on a given date is <br />returned to the river at a flat rate on the following day. <br /> <br />Operation "skim" and storage of surplus Big Thompson River water in <br />project reservoi rs is accordi ng to the AOP and as prescri bed by the <br />Water and Power Control Division. <br /> <br />29 <br />