Laserfiche WebLink
<br />28 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3. Operation after snowmelt period (August I-October 15) <br />a. Bypass inflow as required to supply downstream vested rights. <br /> <br />o <br />o <br />~ <br />-.1 <br />00 <br />~ <br /> <br />b. Replace water withheld by the CBT Project, as required. <br /> <br />c. Maximize power operation consistent with l.c. <br /> <br />d. Make releases as outlined in the above referenced documents. <br /> <br />The operating policy and its final notice for Green Mountain Reservoir <br />were published in the Federal Register on December 22, 1983., <br />