My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03460
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:31 PM
Creation date
10/11/2006 11:44:53 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.700
Description
Colorado Big Thompson Project - Annual Operating Plans
Basin
South Platte
Water Division
1
Date
1/1/1989
Title
Annual Operating Plans - Colorado Big Thompson Project - Water Year 1989-1990
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />14 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />o <br />~ <br />-:l <br />fS) <br />-.l <br /> <br />through Flatiron Unit 3 fo... testing pu...poses, which p...oduced <br />7,U49 kilowatt hou...s of energy. <br /> <br />A total of 69,206 acre-feet of water was pumped to Ca...ter Lake du...ing <br />the wate... year which was 86 percent of ave...age. This required <br />22,100,000 kilowatt-hou...s of ene...gy. <br /> <br />Ho...setooth Reservoir <br /> <br />Comp 1 eted in 1949, with fou... dams, Horsetooth Reservoi r has a tota 1 <br />const...ucted capacity of 156,700 acre-feet. Inflow of Project water is <br />f...om Flatiron Rese...voir via the Cha...les Hansen Feeder Canal. <br /> <br />Horsetooth Reservoir sto...age of 70,166 ac...e-feet at the sta...t of water <br />year 1989 was nea... the 30-yea... no...mal of 71,800 ac...e-feet. <br /> <br />During early Octobe..., most P...oject water b...ought over from the Colo...ado <br />Rive... was pumped to Carter Lake due to the schedu led pressure tunne 1 <br />wo...k. Maintenance on the 550 ft3/s section of the Charles Hansen Feede... <br />Canal, during the Octobe... 1 to October 14 period, p...evented t...ansfe... of <br />wate... to Ho...setooth. <br /> <br />No...mal t...ansfer of water to Ho...setooth Reservoir th...ough the foothills <br />system of the Project began on October 14 when the 550 ft3/s section <br />of the Charles Hansen Feede... Canal became available. This operation <br />continued through mid-September when the 930 ft3/s section of the <br />Cha...les Hansen Feede... Canal was shut down for the annual slab ...eplacement. <br />Dille Tunnel was then utilized fo... the remainder of Septembe... to deliver <br />water to Ho...setooth Reservoi.... Fo... wate... year 1989, the maximum <br />Horsetooth Rese...voi... storage of 134,131 acre-feet (water surface <br />elevation 5418.44 feet) was ...eached on April 6. This was 6.66 feet <br />below the current rest...icted maximum water su...face elevation of <br />5425.10 feet (146,900 ac...e-feet). <br /> <br />Project water del iveries began on Ap...il 25 and we...e near 225 ft3/s by <br />the end of the month. May wate... de 1 i veri es from Ho...setooth Rese...voi... <br />were 461 percent above ave...age due to an extremely dry spring, for a <br />total of 23,500 acre-feet. <br /> <br />Water deliveries were 121 percent and 137 percent of ave...age in June and <br />July, at 9,400 acre-feet and 38,500 ac...e-feet, ...espect i ve ly. August <br />p...oject wate... delive...ies of 30,800 acre-feet we...e below normal at <br />94 percent of average. September p...oject water deliveries decreased to <br />55 percent of average. Total seasonal water del ive...ies (October-September) <br />for 1989 were 26,300 acre-feet above norma 1 at a tot a 1 of <br />119,500 acre-feet. <br /> <br />The September 30 end-of-wate...-yea... storage totaled 63,778 ac...e-feet <br />and this was 8,022 acre-feet below the 1959-1985 ave...age. The actual <br />operations fo... the Colorado-Big Thompson Project for water yea... 1989 <br />are summa...ized in table 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.